My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-299
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Site Plan File - Approved PLZ 01900
>
LP-201-299
>
LP-299
>
LP-299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2007 12:57:03 AM
Creation date
1/5/2007 3:33:25 PM
Metadata
Fields
Template:
House File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BUILDING <br /> <br />1. Structure Size: <br />2. Structure Height: <br />3. Exterior Treatment: <br />4. USC Compliance: <br />5. Other Considerations: <br /> <br />SANITATION/HOUSING <br /> <br />1. <br />2. <br />3. <br />4. <br /> <br />Seating Requirements: <br />Kitchen Facilities: <br />Garbage/Rubbish Enclosures: <br />Other Considerations: <br /> <br />PARKS <br /> <br />Page 4 <br /> <br />100' x 100' or 10,000 square feet <br />20 feet <br />Rock face concrete block <br />To be determined <br />None <br /> <br />NA <br />NA <br />To be enclosed <br />None <br /> <br />1 . Impact on Parks: <br />2. Impact on Community Facilities: <br />3. Other Considerations: <br /> <br />None <br />None <br />None <br /> <br />FORESTRY <br /> <br />1 . Tree Preservation: <br />2. Proposed Trees: <br />3. Other Considerations: <br /> <br />FIRE <br /> <br />1 . Access to Site: <br />2. Access to Structure: <br />3. Additional Hydrants: <br />4. Y Connection Location: <br />5. Other Considerations: <br /> <br />POLICE <br /> <br />1 . Traffic Safety: <br />2. On-street Parking: <br />3. Site Security: <br /> <br />STAFF COMMENTS <br /> <br />None <br />Adequate <br />None <br /> <br />Adequate <br />Adequate <br />None <br />Northwest corner <br />None <br /> <br />Adequate <br />None <br />Adequate <br /> <br />The proposed development complies with all 1-1 standards and parking standards. <br /> <br />The proposed manufacturing building would be divided into two sections; one for the applicant <br />and the other to be leased out. The building would be located on a vacant site now owned by the <br />City and once occupied by Robinson Coach. The proposed development would complete the <br />City's redevelopment efforts for this southern portion of the Robinson Coach site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.