My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-301
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Site Plan File - Approved PLZ 01900
>
LP-300-399
>
LP-301
>
LP-301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2007 12:56:02 AM
Creation date
1/5/2007 3:48:25 PM
Metadata
Fields
Template:
House File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />LAW OFFICES <br />HESSIAN, MCKASY & SODERBERG <br /> <br />PROFESSIONAL ASSOCIATION <br /> <br />Minneapolis . Saint Paul . Washington, D.C. <br /> <br />4700 IDS Center <br />80 South Eighth Street <br />Minneapolis, Minnesota 55402-2228 <br />(612) 330-3000 Facsimile 371-0653 <br /> <br />Jaymes D. Littlejohn <br />(612) 330-3003 <br /> <br />March 7, 1995 <br /> <br />Mr. Emy Mati1la <br />City of New Brighton <br />803 Fifth Avenue N.W. <br />New Brighton, MN 55112 <br /> <br />Re: Tower Option and Lease Agreement - MINBESTSERVER <br />Our File No. 5302-003 <br /> <br />Dear Mr. Mati1la: <br /> <br />Enclosed for your information are drawings which contain site plans and elevations for <br />the proposed cellular telephone antenna site to be located at the New Brighton water tower on <br />5th Street Southwest. As we discussed, my client's agreement with your city includes an option <br />period in which zoning approvals may be obtained, but we are eager to commence the rental <br />period so that construction on the site may be performed as soon as possible. <br /> <br />As you know, the water tower is located in an 1-1 (Light Industrial) since public utility <br />uses are permitted in this district under section 6-030( d) of your Zoning Code, and since this <br />involves improvements upon city property, I agree with your assessment that formal zoning <br />process is probably not necessary. If you have any suggestions for changes to the design of this <br />facility, please let me know so that we can incorporate those recommendations into the working <br />drawings when we apply for the building permit. <br /> <br />As you suggested, I am sending a copy of this letter and these drawings to Mr. Proper <br />for his use. After you both have had an opportunity to review these, please contact me so that <br />I may advise my client accordingly. Thank you for your assistance. <br /> <br />Sincerely, <br /> <br />IAN, McKASY & SODERBERG, P.A. <br /> <br /> <br />JDL:jma <br />Enclosures <br />cc: Les Proper <br /> <br />73961-1 0530200-003000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.