Laserfiche WebLink
October 7, 1997 <br />Emy Matilla <br />City Council <br />City Planning Commission <br />City of New Brighton <br />803 Fifth Avenue N.W. <br />New Brighton, MN 55112 <br />Re: New Brighton Church <br />Dear Emy: <br />cShinCLCI%bee <br />On behalf of the New Aposolic Church, we respectfully are seeking a special use permit <br />for constructing a new church building. The property on which the building will be <br />constructed is located at the Northwest corner of Old Highway #8 and First Street <br />Northwest. <br />The facility will be a wood framed structure with brick venire for the exterior finish. The <br />building will be constructed on a slab on grade. <br />The Church is seeking the permit based on the following reasons: <br />A. The membership is presently meeting in a rented facility on a month-to-month <br />basis creating hardship and stress at a time when peace and joy is desired. <br />B. The members live within and around the New Brighton City limits, presently <br />without a permanent meeting place. <br />C. Their old building was sold due to its age and location. <br />D. A new church building is of dire need by the members, and will be of great <br />betterment for the current and future members. <br />E. The location of the property allows access from Old Highway #8. The time and <br />days in which the facility will be occupied is of a minimum to low impact use. <br />The new facility will have a seating capacity of 125. The current average attending <br />membership is 42, therefore, allowing room for growth <br />6hinpbee Builders. Inc. <br />66" N. Medina Street, P.O. Box S. Loretto, MN 7:357-0005 (612) =79-L300 <br />General Contractor 4 Construction Management DDe8i8n/F)dd