My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-336
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Site Plan File - Approved PLZ 01900
>
LP-300-399
>
LP-336
>
LP-336
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2007 4:04:26 PM
Creation date
1/22/2007 1:46:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 <br />FIRE <br />1. Access to Site: <br />2. Access to Structure: <br />3. Additional Hydrants: <br />4. Y Connection Location: <br />5. Other Considerations: <br />POLICE <br />Adequate <br />Adequate <br />An additional hydrant adjacent to the southern property entrance <br />is required. <br />Adequate <br />None <br />1. Traffic Safety: Adequate <br />2. On-Street Parking: None <br />3. Site Security: Adequate <br />STAFF COMMENTS <br />The applicant's proposal complies with the standards of the I-2, Heavy Industrial district and the City's <br />parking requirements with the exception of the twenty-five (25) foot front yard parking setback, which <br />requires a fifteen (15) foot setback variance. <br />The subject site is identified as Lot 1 of the proposed Brighton Corporate Park III Plat. The Plat, if <br />approved, would extend County Road E2, providing access to the subject site. The plat would also <br />provide sidewalk, drainage, and utility easements around the periphery of the subject site. Also, a <br />triangular shaped easement would be located at the SW corner of County Road E2 and 5th Avenue NW <br />and is intended to accommodate landscaping and similar streetscape improvements in accordance with <br />the Old Highway 8 Corridor Vision (Sections 8.6, 8.7). The approval of the applicant's proposal is <br />dependent upon approval of the Brighton Corporate Park III Plat. <br />The subject site is part of the former MacGillis & Gibbs lumber treatment yard, the location of both soil <br />and groundwater contamination. The subject site was chosen as the first portion of the former MacGillis <br />& Gibbs site to be redeveloped because it is considered one of the "cleaner" areas. Even though clean up <br />of the contamination is being conducted by the EPA and MnPCA, the western portion of the subject site <br />is still contaminated and remains unbuildable. <br />The applicant is requesting a fifteen (15) foot front yard setback parking variance. The proposed parking <br />area complies with the City's parking requirements, except for a twenty-five (25) foot front yard parking <br />setback. The City of New Brighton Zoning Ordinance requires a forty (40) foot front yard parking <br />setback. Therefore, a fifteen (15) foot front yard setback parking variance is required. The applicant <br />would, under normal circumstances, be able to place the proposed building and parking lot on the subject <br />site without needing a setback variance. However, the contamination of the western portion of the site <br />does not make it possible for the applicant to "shift" the proposed building any further to the west. <br />Therefore, the front yard parking area located east of the proposed building is caused to encroach 15 feet <br />into the front yard setback area. The contamination of the subject site creates a unique circumstance and <br />strict enforcement of the City's front yard parking setback requirement would cause the applicant undue <br />hardship. The plight of the property owner is due to circumstances unique to the property in question and <br />was not created by the applicant. The requested variance would conform with the comprehensive plan <br />and would not be detrimental to adjacent property owners or the public as a whole. <br />G:\CD\-98-C C\REPO RTS\ERNY\V N-317. WPD
The URL can be used to link to this page
Your browser does not support the video tag.