My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP-046
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Special Use Permit File PLZ 02100
>
SP 001-100
>
SP-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2007 2:03:46 AM
Creation date
2/1/2007 11:14:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: May 16®- 19y2 <br />• CASE NUIvIbER: SP 4b <br />APPLICANT: Northwest Investments <br />LOCATION: Arden Court Apartments <br />REQUEST: Special Use Permit for Day Care Center <br />PLANNING CONSIDERATIONS: (See Report SP~15) (Day Nursery) <br />Please review Zoning Code Sections noted in Report for SP 45. <br />The issuance of a-Special Use Permit should be based on -the following: (1) Need for <br />proposed use, (2) location, (3) effect on suerounding uses® and (4) health, welfare <br />and safety of the general public is inhanced. <br />both of these requests (SP 45 and 46) meet in a positive way criteria 1, 2 and 3 <br />above. Criteria 4 cannot be guaranteed, but attempts should be made to elim-mate <br />possible undersirable elements. State laws and licensing procedure must be fol- <br />lowed. The Village should probably require periodic inspection by Fire and Health <br />Inspectors to supplement State Inspections. The Village should review annually the <br />conditions of the permit. <br />The need for day care centers is apparent. The Federal Government recognizes <br />this need and several programs have been initiated to promote day care activities. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.