My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP-058 (2)
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Special Use Permit File PLZ 02100
>
SP 001-100
>
SP-058 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2007 12:09:00 PM
Creation date
2/5/2007 11:57:17 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />W. The United Theological Seminary shall convey to the <br />city of New Brighton at no cost to the City the <br />following easements: <br /> <br />1. An easement 150 feet by 150 feet near 5th Street <br />NOJ; th'Nest for the installation, maintenance and <br />operation of a deep ",ell with pump, pump house <br />and appurtenances. <br /> <br />2. A perpetual easement munning in a generally <br />north and south direction from 5th Street North- <br />west to the north property line of the premises <br />described. Said easement shall be 20 feet wide <br />and shall be for the installation, maintenance <br />and operation of a 20 inch watermain and <br />appurtenances. <br /> <br />3. Such temporary construction easements as may be <br />required in addition to and adjacent to easements <br />described above, the period of construction only' <br />conditioned upon restoration by the City of the <br />premises following construction. <br /> <br />x. At the present time a maintenance building is <br />located on Tract E. permission is hereby granted to <br />move that building from Tract E onto the land <br />herein described so long as such building is not <br />placed in an area designated for single family <br />residence on the lal:.d use plan and so long as the <br />relocated maintenance building meets setback and <br />other permit requirements for other buildings in <br />the same area. The provisions of paragraph N of <br />this permit need not be met before this building <br />I is moved. <br /> <br />IAdopted this 23rd day of December, 1974 <br /> <br />I <br />~~W~~ <br /> <br /> <br />ATTEST: <br /> <br />II <br />'I <br />I <br />i <br />.i <br />Ii <br />II <br />I <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.