My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP-097
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Special Use Permit File PLZ 02100
>
SP 001-100
>
SP-097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2007 11:05:50 AM
Creation date
2/13/2007 12:33:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />""'- ',,)-:- <br /> <br />April 17, 1981 <br /> <br />APPLICATION FOR FINAL PLANNED RESIDENTIAL DEVELOPMENT, PRD-31 <br />PRELIMINARY PLAT,~ <br />SPECIAL USE PERMI SP-97 '; <br />BUILDING PERMIT, l~- <br />"BELAIR BUILDERS <br /> <br />FINAL PRO <br /> <br />Conditi6ns of Council Resolution No. 2436: <br /> <br />1. <br /> <br />Grading and Drainage - The final plan relocates the <br />pond and moves the tennis courts to the southeast. <br />The City Engineer comments that he has no major <br />concerns over the revised grading and drainage plan. <br /> <br />The Fire Department requests that the driving lane <br />on the plans have less of an angle and that seven <br />eastern parking spaces be removed. This is the area <br />on the plan just south of where the driving lane <br />bends to go eastward. The seven parking spaces <br />will' hav~ to be relocated on the site. The Fire <br />Department will further monitor the final building <br />plans in reference to sprinkler connections, etc. <br /> <br />The Building will not be of masonary construction, <br />it will be a wood frame building with brick veneer. <br /> <br />A final plat has not been prepared but the applicant <br />has agreed that the units will be platted for <br />individual ownership. <br /> <br />The applicant,has agreed to access off of Windsor <br />Lane rather than Silver Lake Road. The City Engineer <br />is presently discussing with the applicant redesigning <br />with Windsor Green As~ociation an access IDore <br />acceptable than the one depicted on the plans. The <br />resolution requires an access acceptable to the City <br />Engineer. <br /> <br />The excavation and filling computation have not <br />been made available. ' <br /> <br />The paving and concrete curbing is noted on the plans. <br /> <br />The plan only depicts two of the required four <br />handicap spaces. <br /> <br />Landscaping - The City Forrester reviewed the plan <br />and comments that the proposed plan is compatiable <br />with the Windsor Green development. He voiced a <br />concern over the fill material to be used and how <br />it would affect the proper growth of the plantings. <br /> <br />The Council held the first reading of the rezoning. <br /> <br />The plans depict 80 units. <br /> <br />No agreement has been given by the applicant. <br /> <br />The preliminary plat notes the proposed right-of-way. <br />This area is required to be on the dedications of <br />the final plat. <br /> <br />(}) <br /> <br />: 5. <br /> <br />10. <br />II. <br />12. <br />13. <br /> <br />2. <br /> <br />4. <br /> <br />6. <br /> <br />7. <br />8. <br /> <br />9. <br />
The URL can be used to link to this page
Your browser does not support the video tag.