My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP-097
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Special Use Permit File PLZ 02100
>
SP 001-100
>
SP-097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2007 11:05:50 AM
Creation date
2/13/2007 12:33:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />" <br /> <br />~ <br /> <br />("- <br />-0 ," <br /> <br />In our opinion, the proposed use of the site is very desirable when the alternate <br />permitted uses are considered. Because of land and development costs, the density <br />of units on the site must be reasonably high to make the project financially <br />feasible. However, ,-the higher densities proposed do not, in our view, create <br />unmanageable service and access problems. <br /> <br /> <br />PROPOSED STREET RIGHTS-OF-WAY <br /> <br />The rezoning of the property was subject to several staff recommended stipulations <br />or conditions. Among them was the dedication of a 17 foot strip along the west <br />edge of the site for the possible future widening of Silver Lake Road and a 16 to <br />16.5 foot strip on the north side for the possible widening of County Road E. <br /> <br />It is not unusual that the County and/or City request holding buildings back for <br />future widening projects. It should be determined, however, whether the extra <br />right-of-way will be used for new roadways or to serve as a buffer (publicly owned <br />right-of-way) between the actual street lanes and developed land. <br /> <br />The taking repre~ents about 0.35 acres 0.5,300 square feet), or roughly 5..5 percent <br />of the project land area. The cost to the developer to acquire and dedicate this <br />land is a front-:-end cost of sufficient magnitude to -affect the feasibility of the <br />project. <br /> <br />,. <br />\,. - <br /> <br />Normally, when right-of-way contributions are requested or required, a much <br />larger parcel of land is proposed for development. Typical in such cases, it can be <br />shown that the right-of-way dedication and subsequent street construction is <br />necessitated by the increased trip generation from the site and is, therefore, a <br />direct benefit. to the developer. 'This is not the case for the proposed <br />development. <br /> <br />PROJECT COMMENTS RECEIVED AT THE MARCH 8 HEARING <br /> <br />1. Silver.,Lake Road access. The project access from Silver Lake Road can be <br />combined with the public access to Windsor Green if desired. it would be <br />preferable, however, if the combined access can be made as far east of Silver <br />Lake as possible. An alternate worth investigating is a combined driveway <br />closer to the proposed pond. Through an exchange or dedication of <br />easements, the condominium development tenants have a better access to <br />Silver Lake, Windsor Green tenants have access to County Road E and both <br />have a safer access to Silver Lake Road. <br /> <br />c <br />--.-. <br /> <br />2. Dead-ending access through the site. For reasons of maintaining emergency <br />access as well as more flexible access to the site buildings, the roadway <br />through the development should be maintained. It is so indirect that "short- <br />-cutting" through the site would be minimal. So called"speed bumps" could be <br />used but they are undesirable for maintenance, etc. Access to either building <br />from either access drive is desirable so that tenants can exit or enter via <br />right turns rather than necessitating left turns off Silver Lake Road. <br /> <br />Questioned trip generation. The 5.4 trip ends per unit was selected from a <br />range of .5.1 to .5.4 per day recommended (nationally) for condominiums. The <br />recommended rate is low for residential and only half that of single family <br />housing but it is typical ~f condominium development in this metropolitan <br />area. The reduced rate is typical of the age structure of tenants, family size <br />of this type of housing and the cost range of such development. <br /> <br />3. <br /> <br />_........~---------~------~-~ ,--- - - ~ - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.