Laserfiche WebLink
Addition to Kausel Foundry <br />350 First Street S.W. <br />New-Brighton, MN 55112 <br />Variances requested for above project to be considered by the City Council <br />of New Brighton. <br />1. Building height exceeds that height specified in Zoning Code, Section <br />10-110, Paragraph F (40.0') by approximately 7'-0"± at Environmental <br />Equipment Enclosure. <br />a. Variance-requested because the environmental control equipment for <br />Air Filtration, Dust and Pollutant Collection, and Heat Energy <br />Recovery is designed to be enclosed for unit functioning, maintenance; <br />and inspection. If mounted exposed on roof, this equipment would <br />be more costly, less serviceable, esthetically less appealing. <br />Equipment would be mounted above 39'-0" basic building height. <br />2. Construction of Building Expansion with less than required set back <br />at North property line. <br />a. Variance requested because the maximum allowable curvature of _the <br />rail spur onto to property dictates that the north wall of the building <br />abut the property line. <br />3. Provide one additional door adjacent to loading entrance on south <br />elevation of building facing public street. <br />a. Variance requested to provide adequate delivery access to the <br />beginning of the production sequence.