Laserfiche WebLink
_ KENZLER ENGINEERING COMPANY, INC. <br />4 September 1974 <br />Kausel Foundry Co. <br />350 First Street <br />New Brighton, MN 55112 <br />Attention: Mr. Chuck Kausel, Jr. <br />Executive Vice-President <br />Dear Chuck <br />8512 W. LISBON AVE., MILWAUKEE, WIS. 53222 <br />PHONE (414) 463-1233 <br />Following is the information you requested on costs directly <br />attributable to EPA and OSHA requirements: <br />Melting Department <br />Preheater $ 174,000 <br />Ductile Iron Plunging 3,300 <br />General Environmental Control <br />Dust Collection,-BI-as- Cleaning <br />and Sand Reclaim 105,000 <br />Rework of existing Dust Collector <br />System 41,580 <br />Dust & Fume Collector for Ductile <br />Plunging 30,000 <br />Dust & Fume Collection for Weld- <br />ing Booths 4,000 <br />Dust & Fume Collection for Grind- <br />ing Booths 20,400 <br />Heating & Ventilating <br />Heated Make-Up Air 25,000 <br />Electrostatic Precipitators 52,800 <br />Sand System <br />Localized Dust Collection 10,000