My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VN-136
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Variance Files PLZ 02400
>
VN 101-200
>
VN-136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2007 11:50:21 AM
Creation date
2/21/2007 4:13:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ KENZLER ENGINEERING COMPANY, INC. <br />4 September 1974 <br />Kausel Foundry Co. <br />350 First Street <br />New Brighton, MN 55112 <br />Attention: Mr. Chuck Kausel, Jr. <br />Executive Vice-President <br />Dear Chuck <br />8512 W. LISBON AVE., MILWAUKEE, WIS. 53222 <br />PHONE (414) 463-1233 <br />Following is the information you requested on costs directly <br />attributable to EPA and OSHA requirements: <br />Melting Department <br />Preheater $ 174,000 <br />Ductile Iron Plunging 3,300 <br />General Environmental Control <br />Dust Collection,-BI-as- Cleaning <br />and Sand Reclaim 105,000 <br />Rework of existing Dust Collector <br />System 41,580 <br />Dust & Fume Collector for Ductile <br />Plunging 30,000 <br />Dust & Fume Collection for Weld- <br />ing Booths 4,000 <br />Dust & Fume Collection for Grind- <br />ing Booths 20,400 <br />Heating & Ventilating <br />Heated Make-Up Air 25,000 <br />Electrostatic Precipitators 52,800 <br />Sand System <br />Localized Dust Collection 10,000
The URL can be used to link to this page
Your browser does not support the video tag.