My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VN-169
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Variance Files PLZ 02400
>
VN 101-200
>
VN-169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2007 5:03:35 PM
Creation date
2/23/2007 3:51:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Falcon Oil Company's variance request is very similar <br />to the request in Merriam Park. The $14,000.00 already invested <br />in the canopy is an extensive capital investment for a company <br />our size which will be lost if we are not permitted to erect the <br />canopy. Our business, already showing signs of deterioration <br />on inclement days, will be unable to fully compete with the <br />SuperAmerica Station across the street. Our inability to meet <br />the setback requirement is due to the location of.our building <br />and the pump islands. The building's location and front yard <br />dimensions are unique to our property much in the same way that <br />the inadequate front yard dimensions were found to be unique <br />in Merriam Park. The only difference is that in our case <br />the building and the pump islands are already constructed, <br />causing an immediate and real hardship. In Merriam Park the <br />contractor was only preparing to construct the building. It <br />was economic feasibility (the number of units which could be <br />profitably constructed) and the lot size which allowed the <br />variance to be granted, The case of Falcon Oil is even stronger <br />because there are existing structures on the property. There is <br />no doubt that we are already suffering the adverse effects of <br />a reduction in business due to our inability to compete with <br />SuperAmerica. <br />Council requested that we determine the extent that <br />the pump islands can be moved toward the building in order to, <br />reduce the amount of variance required, and that we determine <br />the costs of such a relocation. In order to determine the <br />9
The URL can be used to link to this page
Your browser does not support the video tag.