~.
<br /> Phase V (1983) Open to Public
<br /> Diseased Tree Inspection. and Removal 3,500
<br /> Turf Maintenance (33 acres-established turf) 3,000
<br /> Tree Planting Maintenance (nature center trees-1.00 trees)- 3,400-
<br /> Sweeping (entrance'road,.parking lots for beach, small
<br /> group picnic areas, boat launch, large group picnic area). 500
<br />750
<br /> Sweeping 4f Bikeway
<br />Litter Pickup (beach, picnic areas, boat launch) 12,500
<br /> Litter Disposal 1,80Q
<br />200
<br />1
<br /> Beach Maintenance ,
<br />000
<br />25
<br /> Beach Operation ,
<br />000
<br />1
<br /> Bathhouse Maintenance ,
<br />000
<br />8
<br /> Bathhouse Operation
<br />Picnic Shelter Maintenance (small and large group picnic areas) ,
<br />2,400
<br /> Picnic Table and Gri11 Maintenance (small and large group
<br />000
<br />2
<br /> picnic area)
<br />Grooming Cross Country Ski Trail .
<br />.,
<br />1,700
<br /> Picnic Pavilion Maintenance 500
<br />000
<br />1
<br /> Fish Dock Maintenance ,
<br /> Snow Plowing (entrance roads and parking lots for bathhouse 500
<br />1
<br /> and boat launch for winter access to lake) ,
<br />000
<br />2
<br /> Pavement Repair ,
<br />500
<br />1
<br /> Sign Maintenance ,
<br />500
<br />1
<br /> Luminaire Maintenance ,
<br />ANNUAL
<br />• $ 74,750 TOTAL
<br /> Phase VI (1984) Open to Public
<br />Diseased Tree Inspection and Removal 3,500
<br />
<br />Turf Maintenance (33 acres-established to rf) 3,000
<br /> Tree Planting Maintenance (nature center trees, pruning of
<br />400
<br />3
<br /> 2000 trees)
<br />Sweeping (all roads and parking lots) ,
<br />500
<br />750
<br /> Sweeping of bikeways
<br /> Litter Pickup (beach, small and large group picnic area,. 500
<br />12
<br /> boat launch, nature center) ,
<br />1,800
<br /> Litter Disposal 1,200
<br /> Beach Maintenance ~ 25,000
<br /> Beach Operation 1,000
<br /> Bathhouse Maintenance 000
<br />8
<br /> Bathhouse Operation
<br />Picnic Shelter Maintenance (small and large group picnic area) ,
<br />2,400
<br /> Picnic Table and Grill Maintenance 1,000
<br />500
<br /> Picnic Pavilion Maintenance 700
<br />1
<br /> Groom Cross Country Ski Trails ,
<br />1,000
<br /> Fish Dock Maintenance
<br />Snow Plowing (entrance roads, and parking lots for bathhouse,
<br />
<br />boat launch, camp lodge and nature center) 1,200
<br />1$,500
<br /> Nature Center Maintenance 43,000
<br /> Nature Center Operation 1,000
<br />• Camp Lodge Maintenance 3,000
<br /> Camp Lodge Operation 500
<br /> Boat Launch Maintenance
<br />
|