w
<br />
<br />t~ ~ ,~
<br />BID FORTi
<br />PAGE 3 OF 4
<br />-UNIT PRICES: FOR CHANGING QUANTITIES OF WORK ITEMS FROM THOSE INDICATED
<br />BY THE CONTRACT DRAI9INGS UPON 1VRITTEN INSTRUCTIONS FROM THE LANDSCAPE
<br />ARCHITECT, THE FOLLOWING UNIT PRICES SHALL PREVAIL. ,THE UNIT PRICES
<br />SHALL INCLUDE ALL LABOR, MATERIALS, SHORING, REMOVAL, OVERHEAD, PROFIT,
<br />.INSURANCE, ETC:, TO COVER THE FINISHED WORK OF THE SEVERAL KINDS CALLED
<br />FOR.
<br />CONCRETE WALK REb4OVAL, PER SQUARE YARD $
<br />BLACKTOP WALK REMOVAL, INCLUDING BASE, PER
<br />SQUARE YARD $
<br />ROUGH GRADING, ON SITE, PER CUBIC YARD $
<br />CLAY BORROR', PER CUBIC YARD $
<br />GRANULAR BORROW, PER CUBIC YARD $
<br />FINE GRADING, TILLING, FERTILIZING AND $
<br />SODDING, PER SQUARE YARD
<br />FINE GRADING, TILLING, FERTILIZING AND
<br />.SEEDING, INCLUDING MULCH, PER SQUARE
<br />YARD $
<br />4" CRUSHED ROCK BASE, PER SQUARE YARD $
<br />1-I/2" ASPHALTIC WEARING COURSE (2341), PER $
<br />SQUARE YARD
<br />6" DIAMETER P.V.C. ir£RFORATED DRAIN SEtiti~ER,
<br />PER LINEAL FOOT $
<br />6" DIAMETER P.V:C. STORM SEWER, PER LINEAL
<br />FOOT $
<br />CATCHBASIN, PER EACH $
<br />MANHOLE (STANDARD 48" DIA.), 6 FOOT DEEP,
<br />PER EACH $
<br />MANHOLE SUMP (STANDARD 48" DIA.), 12 FOOT
<br />DEEP, PER EACH $
<br />1-1/4" P.V.C. IRRIGATION PIPE, PER LINEAL
<br />FOOT $
<br />1-1/2" P.V.C. IRRIGATION PIPE, PER LINEAL
<br />FOOT $
<br />2" P.V.C. IRRIGATION PIPE, PER LINEAL FOOT $
<br />2-1/2" P.V.C. IRRIGATION PIPE, PER LINEAL
<br />FOOT $
<br />3" P.V.C. IRRIGATION-PIPE, PER LINEAL
<br />FOOT $
<br />4" P.V.C. IRRIGATION PIPE, PER LINEAL FOOT $
<br />SPRINKLER HEAD, TORO 640, INCLUDING RISER,
<br />PER EACH $
<br />GREEN'S ASH, 3" CALIPER, PER EACH $
<br />RUSSIAN OLIVE, 1-1/2" CALIPER, PER EACH $
<br />A CASHIER'S .CHECK, BID BOND, OR CERTIFIED CHECK IN THE AMOUNT OF
<br />DOLLARS ($ ) DRAWN TO
<br />THE ORDER OF THE TREASURER, INDEPENDENT SCHOOL DISTRICT N0. 621 ST.
<br />PAUL, MINNESOTA~IS ATTACHED HERETO WITH THE UNDERSTANDING THAT IF THIS
<br />BID IS ACCEPTED AND THE UNDERSIGNED REFUSE, FAIL OR NEGLECT TO EXECUTE
<br />THE CONTRACT AND FUNISH BOND A'ITHIN TEN DAYS OF THE DATE OF ACCEPTANCE
<br />
|