Laserfiche WebLink
~• <br />July 14, 1970 <br />TQ; Mr. Robert Schaefer, Village Manager and Park Board Members <br />FROM: Robert M. Wicklund, Parks and Kecreation Director <br />SUBJECT: Cost of .Alterations on 7th Street Play Structure <br />At the Park Board meeting of July 8, 1970, there were six suggestions for <br />modifying. the 7th Street play structure with the intent of increasing its <br />safety. Two of these modifications were of no cost to the Village and were <br />recommended by the Park Board for completion. .The remaining four modifications <br />. were to be considered as to their cost a The following estimates have been <br />submitted by Overdahl Construction, the original contractor. <br />1. Lowering the height of the ent <br />Cost: $2,000 to $2,500. This <br />lift the structure cutting 'off <br />the structure in new footings. <br />2. Adding a railing approximately <br />the head of each slide. <br />f- Cost; $40 <br />ire structure by 3 feet. <br />cost involves use of a crane to , <br />one entire deck level and replacing <br />This is a very expensive procedure. <br />1/2 the length of the platforms at <br />3. Enclose the open area in the southwest wall with vertical slats. <br />Cost: $50 <br />4. Fill in the open area with flooring on the deck in the southeast <br />,corner. <br />Cost: $50 <br />The contractor states that these estimates were based on doing any of the <br />work recommended at one time. <br />This subject will be included on the agenda for the"next Park Board meeting <br />and a recommendation should be made at that time. <br />D ? ~~ _ <br />Robert M. Wicklund <br />Parks and Recreation Director <br />.~, <br />_ _ ~, <br />