My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRECM 06-03-1970
NewBrighton
>
Commissions
>
Commissions-OLD
>
Parks And Recreation
>
Minutes Park & Recreation Commission Meetings P&R 01200
>
MINUTES
>
1970
>
PRECM 06-03-1970
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2007 3:07:09 AM
Creation date
3/20/2007 4:14:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARK BQAl.~1~ i~I.~ETT_IdG _ <br />~Ture 3, 1970 <br />Thc~ meeting crab, c~I2,esi to order at 8~ 13 <br />3oard Members presentx ~,3ah1, ~iageraey~r, ~c~e~n~ Smf~h <br />Reissman appeared at X045: <br />Bc-ard Membe~~ Absent: rnhil':, S'her~.ock <br />pt'hers Pr~s~t: Ebert ~'3.ok3.canc~, ~Ti1~.ag~e Park and Recreation Direc•cor <br />Minutes of muting t~~ May ~, ~ were appr~~ed as s~~.t~ed <br />Chai:~.an [~under~aax~ %ntroded the x~ew b~-a mer €r~ld ~n~.th to <br />the 1~dar~ ate. cit~.~en~ pgesent at the meet~.ng. <br />Mrs . Dahl x~+ecruested that the Park ~am~.rzg cs~ratest he added tee the <br />agenda. <br />Seventh Street Park Develdpxnent <br />A report was g~tve:n on the ststcas of tY_-e 7t~t Street Pa~'k site. <br />Site Work .. ~'he shaping L3~ the west sa.d.e of the control structure <br />remains tt~ ;be done. The stet ground has delayed this <br />somewhat. <br />Plant ing -The contractor `has planted rile required trees aid <br />shrubs. He is at g~resent fallowing up by watering, <br />pruning, etc. <br />Sod & Seed- The truckers str i 7~e preyrented the contractor fro~^ <br />installing the materials during the May 1 to ,7unf~ 1 <br />planting season. He could start work a t his own risk <br />at this time but the sewer and road wor7c going c- <br />would require some of the planted areas to be dug up~ <br />It was determined. that waiting until the Fuc~ust 15 - <br />September 15 planti~tg season would be the wisest cou:~sn> <br />Paving -- The c©ntrz~ctt~~', cahe was also held up by strakes, ;~eeYar. <br />work on ,a'une l . ~e ~.s laying sewer lines . <br />Building -Meetings have been held with Mr. Arthur Dickey, the <br />architect. bTe has determined that the most suitable <br />site is the area when the tennis courts are shown n~i <br />the or~.ginai plan. T•ne soil is stahlu and ~~"e orieni.a~~:~o.:> <br />is convenient to both t:~e hockey and gEneral skatir,r <br />areas. mhe proposed structure is somec~-hay z~z~_c~ue ire <br />that it ~,s more that a playground shelter but Tess t'ca <br />a full coax~tunity center. The architect intends to <br />
The URL can be used to link to this page
Your browser does not support the video tag.