My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRECM 12-10-1969
NewBrighton
>
Commissions
>
Commissions-OLD
>
Parks And Recreation
>
Minutes Park & Recreation Commission Meetings P&R 01200
>
MINUTES
>
1969
>
PRECM 12-10-1969
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2007 3:04:32 AM
Creation date
3/21/2007 11:13:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r~ <br />~~' -~ <br />r . ~; <br />LETTER TO THE EDITOR: <br />Concern has-been aroused regarding 5th Street and the potential <br />of it going directly through the Seventh Street Park site. <br />The road being built through the park has been in the comprehensive <br />park plan since its inception (1965). This road is designed to complement <br />Yj <br />the park type setting in that it is a winding road limiter <br />~x.~ <br />by its many curves. The purpose of the road is to provide adequate <br />access for public use, proper supervision or serveillance and maintenance <br />effeciency. <br />'Running 5th Street N.W, directly through the pa.r_k has never been <br />proposed nor considered since the inception of the plan. The Village <br />Council fully endorses the comprehensive-park plan and has no intention <br />'o.f altering the concept. Federal and State agencies ,have approved the. <br />detailed plans and since Federal and-State funds have been acquired on <br />the basis of that approval, no major changes can be made without their <br />approval. Any major cha2?ge must be one w'nich will improve or enhance <br />.,\ <br />the concept. It would be ir~epossible to improve or enhance this site by <br />cutting it in half with a major\thoroughfare. <br />One change to the road has already been made in that it now comes <br />directly off of the south end of 13th `Avenue, rather than coming off of <br />`\ <br />5th Street and curving south. This was caused by the discovery of fault <br />in the land where the road originally ran making it impossible to <br />coazstruct at that point. It is .interesting to note that this fault lies <br />in.a direct line between 5th Street (west side) and 5th Street (east side), <br />thus further dispelling the current rumor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.