Laserfiche WebLink
F~age 2' <br />proposal is to be both. basin (in order to know exaotly whom t® starts ar~.d s'ti~.l,~ be <br />broad enough to give the Board some areas o~_disoretiono <br />Foli.owing the meeting with Mro Braue~9 I wound propose that the board give consideration <br />to deoiding whether or not it wishes to meet w3.th other oor~sultantso ~fthe board <br />believes it desirab~,e to hear another Dons'.;.;?tang then it :~s proposed that he be <br />scrieduled for. the regular meeting in Fe?a~°u~,~°~~o A~.th®ugh it should not be t~>o <br />dif f ioult to arrs.nge f or° ar~,wther~ oor~sva.ltar~t9 there :~s a:~ways the probi.em of getting <br />his and the boards availability dates to oon~~~~o <br />Ro ert W, Sehaefer <br />Tillage Manager <br />