My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRECA 11-06-1985
NewBrighton
>
Commissions
>
Commissions-OLD
>
Parks And Recreation
>
Minutes Park & Recreation Commission Meetings P&R 01200
>
AGENDAS
>
1985
>
PRECA 11-06-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2007 2:43:04 AM
Creation date
3/30/2007 12:05:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Anthony J. Croa, director <br />MFM()RANDt1M <br />TeMphnne (812177T-1361 <br />R~AMSEY COUNTY <br />PARKS & RECREATION DEPARTMENT <br />1$50WhRe Beer Avenue <br />St. Paul, Minnesota 55109 <br />To: Larry E. Holmberg <br />From: Ken Simons <br />~'~~ <br />Date: November 4, 1985 <br />Michael L. Mattson <br />Superintendent <br />Larry E. Holmberg <br />Supervisor <br />Planning and Acquisition <br />Subject: MONTHLY REPORT - MASTER PLANS AND DEVELOPMENT OF <br />REGIONAL PARKS (September - October - 1985) <br />I. LONG LAKE REGIONAL PARK <br />A. Beach Refectory Building <br />At the request of the Contractor the building again was jointly <br />inspected by staff, the Architect, mechanical engineers and <br />representatives of the general contractor and sub-contractors. <br />It was determined that approximately 35 percent of items specified <br />in 'the intial "punch list" (August) have been satisfactorily <br />completed. An amended "punch list" is being. prepared by the <br />Architect and will be submitted to the Contractor. with strong <br />encouragement to complete the project by the end of November. <br />B. Site Development <br />Northwestern Bell completed installation of the underground <br />telephone service to the beach refectory building during the <br />last week of October. <br />Generally, site work has been completed. During September <br />and October, the. paving of roads and parking lots was completed, <br />the beach parking lot was striped, all exposed soil was seeded <br />and mulched ar sodded and the sanitary sewer lift station was <br />made operational. <br />C. Historical 50o Line Depot (New Brighton Area Historical Society) <br />The Premises Lease Agreement was approved and signed by both the <br />Historical Society (8-5-85) and the County Board (9-16-85). The <br />agreement will not become effective until the Metropolitan <br />Council approves the proposed Master Plan Amendments, one of which <br />provides for the siting of the Depot within the park. <br />
The URL can be used to link to this page
Your browser does not support the video tag.