My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRECA 07-01-1987
NewBrighton
>
Commissions
>
Commissions-OLD
>
Parks And Recreation
>
Minutes Park & Recreation Commission Meetings P&R 01200
>
AGENDAS
>
1987
>
PRECA 07-01-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2007 2:22:40 AM
Creation date
4/2/2007 1:29:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 26, 1987 <br />To: New Brighton Park Board <br />From: Maurice Ander ctor of Parks and Recreation <br />Re: Civic Center Construction Costs <br />Attached are excerpts from a study that the planning firm of <br />B.R.W., Inc. did for the City of Inver Grove Heights in late <br />1986. The Cities of Coon Rapids, Shoreview and Inver Grove <br />Heights are presently studying the possibility of constructing a <br />civic center. The Cities of Lakeville and Eden Prairie have <br />recently lost referendums on construction of a civic center. <br />If the City of New Brighton seriously considers construction of a <br />civic center the services of a consulting firm will be required. <br />A community survey such as the one recently conducted for. <br />Shoreview cost about $4,000 and a feasibility study for a civic <br />center would cost $10,000-$15,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.