Laserfiche WebLink
PROGRAM: Parks <br />1. project Name: Freedom Parking Upgrade <br />2. Year Recommended: 1988 <br />3. Location:- Freedom Park <br />4. Are plans required? .Yes <br />5. Estimated construction time: 1 Month <br />6. Proposed manner of construction: Contract <br />7. Estimated cost: $20,000 <br />8. Suggested method of finance: Long Lake Proceeds and <br />Property Taxes, <br />9. Statement of Need: The surface needs an asphalt over- <br />lay and-the lot should be curbed. <br />• <br />'~ks 3 <br />