My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRECA 03-02-1994
NewBrighton
>
Commissions
>
Commissions-OLD
>
Parks And Recreation
>
Minutes Park & Recreation Commission Meetings P&R 01200
>
AGENDAS
>
1994
>
PRECA 03-02-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2007 2:07:41 AM
Creation date
4/2/2007 4:15:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />On a related matter, one point of major contention has pertained to the east-west trail extending <br />from Bent Tree Hills Drive to the pond area. Since the Pazk Boazd's meeting, I have had an <br />opportunity to consider this trail development further. There is no question that pazk users need to <br />be provided with the ability and legal right to move within the pazk in an east-west manner. The <br />proposed trail on the park master plan clearly provides this ability. However, given the developing <br />nature of the subdivision area, pedestrian movement patterns have not been established and will not <br />be fully known for a couple more years. The residents in the immediate area have expressed a <br />concern over the construction of an asphalt trail. While I believe it will ultimately be in the <br />municipality's best interest to develop the asphalt trail, I do not believe there is a great urgency to <br />see it constructed until such time as the neighborhood is further along in its development and the <br />demand for the asphalt trail is greater. I believe that by forestating the area, a corridor can be <br />created to be used by the public, but that ultimately an asphalt trail will be deemed necessary to help <br />define the public walkway area. However, in view of the residents concerns, it might be <br />appropriate for the council to consider leaving the east-west trail identified on the park master plan <br />and indicating its intent to defer the actual construction of the trail until a later time (most likely in <br />the third year of the planned pazk development). If the council chooses this option, it is important <br />that everybody understand that this issue, and those critical of an asphalt installation, will reappear <br />at that time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.