Laserfiche WebLink
JANUARY 5, 1994 PARK BOARD MINUTES <br />5 <br />1. THE REFORESTA'ITON OF INNSBRUCK PARK SHOULD BE AN <br />EMPHASIS THROUGHOUT THE DURATION OF THE MUNICIPAL <br />PARK DEVELOPMENT. THE REFORESTATION EFFORT SHOULD <br />INCLUDE THE CONTINUAL CONTACT BETWEEN CITY FORESTER <br />WRISKEY AND AREA RESIDENTS TO DEVELOP A <br />REFORESTATION PLAN COMPATIBLE WITH THE AREA AND <br />SATISFACTORY TO THE PROPERTY OWNERS. <br />2. NORTHERN ACCESS POINT ONTO BLACK OAK DRIVE <br />FORESTER WRISKEY NEEDS TO PLACE STRONG EMPHASIS ON <br />REFORESTATION OF THIS AREA TO ENSURE THE DEVELOPMENT <br />OF AN ADEQUATE BARRIER BETy~'EEN THE PROPOSID TRAIL <br />AND THE IlVIlVSEDIATELY ADJACENT PROPERTY TO THE NORTH. <br />THIS TRAIL SHOULD BE CONSTRUCTED AT A WIDTH OF SIX <br />FEET, EXTENDING FROM BLACK OAK DRIVE TO V~RE THE <br />TR.AII. IINTEFLSECTS WITH THE EAST/WEST TRAII,, SUBJECT TO <br />THE CITY MANAGER REVIEWING ANY LIABILITY EXPOSURE <br />FOR SUCH NARROWER PATHWAY. <br />3. TT:NNIS COURTS THE T'I:NNIS COURTS SHOULD BE KEPT ON <br />- THE MASTER PARK PLAN, BUT THE PARK BOARD RE- <br />EMPHASIZES ITS DESIRE TO KEEP THE DEVELOPMENT OF ANY <br />TTNN7S .COURTS AS A LOW PRIORITY WITHIN THE PARK. <br />4. PARK TRAILS PARK TRAILS THROUGHOUT THE PARK <br />SHOULD BE CONSTRUCTED OF AN ASPHALT MATERIAL AT AN <br />EIGHT FOOT WIDTH, EXCEPT THE NORTHERN BLACK OAK <br />DRIVE ACCESS TRAII. (ITEM NO. 2.) <br />NOTE: COMZVIIS5IONER KNUTH PROPOSED THE FOLLOWING <br />MOTION FOR AESTHETIC PURPOSES AND TO CREATE A <br />NARROWER TRAIL, THE PROPOSED TRAIL TO BE CONSTRUCTID <br />FROM BENT TREE DRIVE TO 3.5 LOTS EASTERLY FROM THE <br />BENT TREE DRIVE SHALL BE DEFINED AS A SIDEWALK, AND <br />THEREBY KEPT AT A NARROWER PATH WIDTH, SUBJECT TO <br />REVIEWING MUNICIPAL LIABII.ITY EXPOSURES INVOLVID. <br />THIS MOTION DIED FOR LACK OF SECOND. <br />5. GAZEBO LOCATION THE PARK BOARD ACKNOWLIDGES <br />THE CONCEPTUAL LOCATION OF THE GAZEBO ON THE MASTER <br />PARK PLAN, AND THAT THE SPECIFIC GAZEBO LOCATION THAT <br />WII.L BE FINALIZED AT THE ACTUAL TIME OF CONSTRUCTION <br />TO ENSURE ITS MOST APPROPRIATE LOCATION. <br />6. THE POND SHALL HAVE A FOUNTAIN INSTALLED WITHIN IT <br />THAT WII.L OPERATE ON A SEASONAL BASIS. <br />