Laserfiche WebLink
` JANUARY 5, 1994 PARK BOARD MINUTES <br />5 <br />1. THE REFORESTATION OF INNSBRUCK PARK SHOULD BE AN <br />EMPHASIS THROUGHOUT THE DURATION OF THE MUNICIPAL <br />PARK DEVELOPMENT. THE REFORESTATION EFFORT SHOULD <br />INCLUDE THE CONTINUAL CONTACT BETWEEN CITY FORESTER <br />WRISKEY AND AREA RESIDENTS TO DEVELOP A <br />REFORESTATION PLAN COMPATIBLE WITH THE AREA AND <br />SATISFACTORY TO THE PROPERTY OWNERS. <br />2. NORTHERN ACCESS POINT :ONTO BLACK OAK DRIVE <br />FORESTER WRISKEY NEEDS. TO PLACE STRONG EMPHASIS ON <br />REFORESTATION OF THIS-AREA TO ENSURE THE DEVELOPMENT <br />OF AN ADEQUATE BARRIER BETWEEN THE PROPOSED TRAIL <br />AND THE IlVIMEDIATELY ADJACENT PROPERTY TO THE NORTH. <br />THIS TRAIL SHOULD BE CONSTRUCTED AT A WIDTH OF SIX <br />FEET, EXTENDING FROM. BLACK OAK DRIVE TO WHERE THE <br />TRAIL INTFILSECTS WITH THE EAST/WEST TRAIL, SUBJECT TO <br />THE CITY MANAGER REVIEWING ANY LIABILITY EXPOSURE <br />FOR SUCH NARROWER PATHWAY. <br />3. TTNNIS COURTS THE TTNNIS COURTS SHOULD BE KEPT ON <br />THE MASTER PARK PLAN, BUT THE PARK BOARD RE' <br />EMPHASIZES ITS. DESIRE TO KEEP THE DEVELOPMENT OF ANY <br />TFI~TNIS COURTS AS A LOW PRIORITY WITHIN THE PARK. <br />4. PARK TRAIIS PARK TRAIIS THROUGHOUT THE PARK <br />SHOULD BE CONSTRUCTED OF AN ASPHALT MATERIAL AT AN <br />EIGHT FOOT WIDTH, EXCEPT THE NORTHERN BLACK OAK <br />DRIVE ACCESS TRAIL (ITEM NO.2.~ <br />NOTE: COMIVIISSIONER KNUTH PROPOSED THE FOLLOWING <br />MOTION FOR AESTHETIC PURPOSES AND TO CREATE A <br />NARROWER TRAIL, THE PROPOSID TRAII. TO BE CONSTRUCTID <br />FROM BENT TREE DRIVE TO 3.5 LOTS EASTERLY FROM THE <br />BENT TREE DRIVE SHALL BE DEFINID AS A SIDEWALK, AND <br />THEREBY KEPT AT A NARROWER PATH WIDTH, SUBJECT TO <br />REVIEWING MUNICIPAL LIABILITY EXPOSURES INVOLVED. <br />THIS MOTION DIED FOR LACK OF SECOND. <br />5. GAZEBO LOCATION THE PARK BOARD ACKNOWLIDGES <br />THE CONCEPTUAL LOCATION OF THE GAZEBO ON THE MASTER <br />PARK PLAN, AND THAT THE SPECIFIC GAZEBO LOCATION THAT <br />WILL BE FINALIZED AT THE ACTUAL TIlVIE OF CONSTRUCTION <br />TO ENSURE ITS MOST APPROPRIATE LOCATION. <br />6. THE POND SHALL HAVE A FOUNTAIN INSTALLED WITHIN IT <br />THAT WILL OPERATE ON A SEASONAL BASIS. <br />