Laserfiche WebLink
<br />. <br />.''\o''~. '.. <br /> <br />ii <br />, , <br /> <br />83-70 <br /> <br />~"I' <<!' <br /> <br />''('" <br /> <br />RESOLUTION NO <br /> <br />STATE OF MINNESOTA <br />COUNTY OF RAMSEY <br />CITY OF NEW BRIGHTON <br /> <br />! RESOLUTION SETTING ELECTRICAL FEES AS AUTHORIZED BY CHAPTER 7 OF <br />. THE NEW BRIGHTON CITY CODE <br /> <br />WHEREAS, Chapter 7 of the New Brighton City Code ordains <br />,that Electfical Fees be specified by Council resolution. <br /> <br />!, NOW THEREFORE BE IT RESOLVED by the Council of the City of <br />j; New Brighton ~hat effective June 1, 1983 electrical fees shall <br />I be as follows. FEE <br /> <br />! <br /> <br />ii <br />'i <br />I, <br />I <br /> <br />; ; <br />1'. <br /> <br />, <br />i <br />I <br /> <br />I <br />I <br />~ I <br />L <br />, <br />, <br /> <br />! <br />I <br />I <br />i <br />i: <br />Ii <br />I: <br />!: <br /> <br />i: <br />fl' <br /> <br />: ! <br />I, <br /> <br />jl <br />I <br />I <br />! <br />! <br />I <br />I <br />i <br />i <br />I <br />I <br />! <br /> <br />1 . <br /> <br />Minimum fee for each separate inspection of <br />an installation, replacement, alteration or <br />repair limited to one inspection only...... <br />Services, changes of service, temporary <br />services, additions, alterations, or repairs <br />on either primary or secondary services <br />shall be computed separately: <br /> <br />o to 100 ampere capacity................... <br />101 to and including 200 ampere capacity... <br />For each additional 100 ampere capacity <br />or fract ion the reo f. . . . . . . . . . . . . . . . . . . . . . <br />Circuits, installations of, additions, <br />alterations or repairs of each circuit or <br />sub-feeder shall be computed separately, <br />including circuits fed from sub-feeders <br />and including equipment served, except as <br />provided for in items (4) through (6): <br /> <br />o to and including 30 ampere capaclty...... <br />(maximum number of 9 to 30 ampere circuits <br />to be paid on is 30 to anyone cabinet) <br />31 to and including 100 ampere capacity.... <br />For each additional 100 ampere capacity <br />or fra ct i on thereof....................... <br />Maximum fee on a single family dwelling <br />shall not exceed $60.00 if not over 200 <br />ampere capacity. This includes service, <br />feeders, circuits, fixtures and equipment. <br />The maximum fee provides for not more than <br />two rough-in inspections and the final <br />inspection per dwelling: Additional <br />inspections at the re-inspection rate. <br />Maximum fee on an apartment building <br />shall not exceed $30 per dwelling unit <br />for the first 20 units and $25 per <br />dwelling unit for the balance of the <br />units. <br />The maximum number of 0 to 30 ampere <br />circuits to be paid on anyone athletic <br />field lighting standard to 10. <br />In addition to the above fees: <br /> <br />a) A charge of $1.00 will be made for each <br />street lighting standard. <br />b) A charge of $2.00 will be made for each <br />traffic signal standard. Circuits <br />originating within the standard will <br />not be used when computing fees. <br />In addition to the above fees, all <br />transformers and generators for light, <br />heat and power shall be computed <br />separately at $5.00 per unit plus 25~ per <br />KVA up to and including 100 KVl\. 101 KVA <br />and over at 20~ per KVA. The maximum fee <br />for any transformer or generator in this <br />category is $50.00. <br /> <br />$6.00 <br />$ 3.00 <br /> <br />$10.00 <br /> <br />rj <br />L.. . <br /> <br />$15.00 <br />$18.00 <br />$ 8.00 <br /> <br />3. <br /> <br />$ 4.00 <br /> <br />4. <br /> <br />5. <br /> <br />6 . <br /> <br />7 . <br /> <br />8. <br />