Laserfiche WebLink
<br />the other party of its intention to allow the franchise to expire, but in no event shall this franchise <br />continue for more than one year after expiration of the 20.year term set forth in Section 2.1. <br /> <br />SECTION 3. LOCATION. OTHER REGULATIONS. <br /> <br />3.1 Location of Facilities. Gas Facilities shall be located, constructed, and maintained <br />so as not to interfere with the safety and convenience of ordinary travel along and over Public Ways <br />and so as not to disrupt normal operation of any City Utility System. Gas Facilities shall be located <br />on or in Public Grounds as determined by the City. Company's construction, reconstruction, <br />operation, repair, maintenance, location and relocation of Gas Facilities shall be subject to any <br />permit requirements authorized in a separate ordinance and other reasonable regulations of the City, <br />consistent with authority granted the City to manage its Public Ways and Public Grounds under <br />state law, to the extent not inconsistent with a specific term of this franchise agreement. Company <br />may abandon underground Gas Facilities in place, provided at City's request Company removes <br />abandoned metal pipe interfering with a City improvement project to the extent such metal pipe is <br />uncovered as part of the City improvement project. <br /> <br />3.2 Street Openings. Company shall not open or disturb the surface of any Public Way <br />or Public Ground for any purpose without first having obtained a permit from the City, if required <br />by a separate ordinance for which the City may impose a reasonable fee, subject to the provisions of <br />Section 9. Permit conditions imposed on Company shall not be more burdensome than those <br />imposed on other utilities for similar facilities or work. Company may, however, open and disturb <br />the surface of any Public Way or Public Ground without a permit if (i) an emergency exists requiring <br />the immediate repair of Gas Facilities and (ii) Company gives telephone, e.mail or similar notice to <br />the City before, if reasonably possible, commencement of the emergency repair. Within two <br />business days after commencing the repair, Company shall apply for any required permits and pay <br />any required fees. <br /> <br />3.3 Restoration. After undertaking any work requiring the opening of any Public Way, <br />Company shall restore the Public Way in accordance with Minnesota Rules, Part 7819.1100 and <br />applicable City ordinances to the extent consistent with law. Company shall restore the Public <br />Ground to as good a condition as formerly existed, and shall maintain the surface in good condition <br />for six months thereafter, but shall have no obligation to water any grass or other vegetation <br />thereon. All work shall be completed as prompdy as weather permits, and.if Company shall not <br />promptly perform and complete the work, remove all dirt, rubbish, equipment and material, and put <br />the Public Ground in the said condition, the City shall have, after demand to Company to cure and <br />the passage of a reasonable period of time following the demand, but not to exceed five days, the <br />right to make the restoration of the Public Ground at the expense of Company. Company shall pay <br />to the City the cost of such work done for or performed by the City. This remedy shall be in <br />addition to any other remedy available to the City for noncompliance with this Section 3.3. The City <br />hereby waives any requirement, in the normal course of Company operations, for Company to post <br />a construction performance bond, certificate of insurance, letter of credit or any other form of <br />security or assurance that may be required, under a separate existing or future ordinance of the City, <br />of a person or entity obtaining the City's permission to install, replace or maintain facilities in a <br />Public Way or the Public Ground. Notwithstanding the foregoing, the City reserves the right to <br />require a performance bond for new installation, replacement, or repairs, when the duration of <br />Company's work within a Public Way is estimated by Company to exceed 14 calendar days and <br /> <br />JMS-223419v4 <br />NE136-154 <br /> <br />3 <br />