My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
0635
NewBrighton
>
Council
>
Ordinance
>
Adopted
>
0600-0699
>
0635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2006 11:49:05 AM
Creation date
6/27/2005 11:25:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. ' <br /> <br />.. <br /> <br />~. <br />"..:: -.J <br /> <br />'\ <br /> <br />ORDINANCE NO. 635 <br /> <br />AN ORDINANCE AMENDING ORDINANCE NO. 623; <br />EXTENDING SAID ORDINANCE IN PART AND REPEALING <br />SAID ORDINANCE IN PART <br /> <br />Section 1. Background. <br /> <br />1.01. By New Brighton Ordinance No. 623, the City imposed a moratorium on the <br />development of land in certain parts of the City as described therein. Ordinance No. 623 was <br />amended by Ordinance Nos. 624 and 627 and extended by Ordinance No. 629. <br /> <br />1.02. The City Council has undertaken a study of the area affected by said moratorium, <br />which study entitled Old Highwav Eight Corridor Study - a Vision for the Heart of New Brighton <br />(the "Study"), was received and accepted by the City Council on June 24, 1997. <br /> <br />1.03. Upon review and consideration of the Study, the Council has determined that the <br />official controls of the City are adequate to address concerns identified in Ordinance No. 623 in <br />some areas affected by said ordinance, but that further study is needed of necessary or expedient <br />amendments to the City's comprehensive plan and official controls as to others. <br /> <br />Section 2. Properties Continuing to be Subiect to Moratorium. <br /> <br />2.01. Properties continuing to be subject to the moratorium of Ordinance No. 623, as <br />amended, include the properties described below in paragraphs 2.02 through 2.05. <br /> <br />2.02. Highway 96 Gateway Site. <br /> <br />2.021. Northwest Quadrant. Property bounded on the east by Old Highway 8, on <br />the south by an extension of the centerline of Highway 96, on the west by a line parallel <br />to and eight hundred fifty (850) feet west of the centerline of Old Highway 8, and on the <br />north by a line parallel to and six hundred fifty (650) feet north of the extension of the <br />centerline of Highway 96. <br /> <br />2.022. Northeast Quadrant. Properties which abut the east side of Old Highway <br />8 between the centerline of Highway 96 and a point seven hundred (700) feet north of <br />said centerline. <br /> <br />2.023. Southeast Quadrant. Properties which abut the east side of Old Highway <br />8, between the centerline of Highway 96 and a point four hundred fifty (450) feet south <br />of said centerline. <br /> <br />2.03. Northwest Quadrant Site. Properties bounded by Old Highway 8 on the west, 14th <br />Street NW on the north, 1-35W on the east, and 1-694 on the south. <br /> <br />CLL129619 <br />NE136-8 <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.