Laserfiche WebLink
<br />Sec. 31 ~4. Adjustment of Storm water Fees. <br /> <br />Fees may be adjusted under the following circumstances. In the case of adjustment <br />under paragraphs C through E, information required to justify an adjustment must be' <br />provided by the resident. <br /> <br />A. Revision of the storm water utility budget ~ The estimated expenditures for the <br />management of storm runoff will be revised at a frequency and procedure consistent with <br />the sanitary sewer and water utilities. <br /> <br />B. Changes in land classification of existing parcels. <br /> <br />C. Parcel runoff is significantly different from land classification standard - No <br />adjustments will be made to single family and two family residential parcels. Where the <br />unit runoff generated by a parcel differs from the amount for that land classification by <br />more than twenty percent (20%), the Director of Public Works may adjust the parcel's <br />storm water utility feejn accordance with the following procedure: <br /> <br />1 . Resident applies for reduction and supplies the City with the <br />following information: <br />a. . Site Plan. <br />b. Lot Size. <br />c. Total area of impervious surface. <br /> <br />2. Director .of Public Works determines the difference in parcel <br />unit runoff to land classification standard unit runoff. <br /> <br />3. Percent credit = <br /> <br />Difference from steD 2 <br />Land classification standard unit runoff <br /> <br />D. Stormwater detention ~ No adjustments will be made to single family and two <br />family residential parcels. An adjustment of up to twenty~five (25%) will be made for <br />those parcels with onsite measures that limit outflow peak events according to the <br />following conditions: <br /> <br />1. Ten percent (10%) credit for parcels that limit peak outflow rates during a <br />5~year rainfall event to rates comparable to the rates from an unimproved <br />vacant property of the same size. <br /> <br />2. An additional fifteen percent (15%) credit will be given to parcels that limit <br />peak outflow rate during a 1 OO~year rainfall event to rates comparable to <br />the rates from an unimproved vacant property of the same size. <br /> <br />It should be noted by the applicant that no adjustment will be made to the existing <br />stormwater utility fee without a skimming device being install with the onsite measures <br />that limit peak outflow events. Skimming shall be considered adequate if a baffle <br />structure extends at least 4 inches below the normal water surface and the velocity of <br />water passing under the baffle does not exceed 0.5 feet per second for the one year <br />rainfall event. <br /> <br />E. Wet ponding credit ~ An adjustment of up to twenty~five percent (25%) will be <br />made to the stormwatElr utility fee of a parcel for onsite measures which are owned and <br />maintained by the applicant that effectively reduces the amount of sediments/nutrients <br /> <br />3 bf 5 <br />