CITY OF
Approved
Regular Meeting
Present: Commissioners Larry Baker, Jim O’Brien, Norm Schiferl, Thomas O’Keefe, David Schmitz, Jeff Schopf and Paul Zisla
Absent: None
Also Present: Patrick Boylan, City Planner , Kevin Locke, Com. Dev. Director
·
Minute Approval -
state Thomas O’Keefe as making motion instead of Larry Baker.
· Agenda Review – No additions
·
Council Action - Council Member
2003 Budget Work Session reviewed.
Public Hearing: PUD 02-001 Planned Unit Development, Preliminary Plat and Site Plan Review. Brighton Village Shopping Center Redevelopment, Kraus Anderson, Inc.
for Engelsma Limited Partnership.
The application is Step I preliminary phase of a Planned Unit Development (PUD). This includes a preliminary plat and site plan review for mixed use development at the existing
Lane Hendel of Kraus Anderson, Paul Settman with Settman Enterprises, Mr. Robey with Settman Enterprises and Brian Munstock with Sunde Civil Engineering were available. The Site Plan was reviewed and there was a question and answer session
with Commissioners and presenters.
increased traffic. She asked about the traffic study and some
possibilities for lessening or diverting the flow from
Nancy Grant of
After some discussion,
financing is not part of the Planning Commission oversight.
Moved by O’Brien, Seconded by Zisla to CLOSE
THE PUBLIC HEARING.
7 Ayes, 0 Nays, Motion Carried.
After considerable discussion between Commissioners and
questions to staff, it was moved by Zisla and Seconded by O’Brien to WAIVE THE
02-001, subject to the following conditions:
1.
Approval
of a permit by the Rice Creek Watershed District.
2.
Lighting
plans reflecting a pedestrian scale are submitted for review by staff and the
Planning Commission and approved by the Council. The plans shall detail materials, height and
include supportive data.
3.
New
elevation drawings showing all building elevations are submitted for review by
staff and the Planning Commission, and approved by the City Council. These elevations should accurately reflect
site grades and other site conditions.
4.
A
revised site plan shall be submitted for review by staff and the Planning
Commission, and approved by the City Council which addresses all conditions of
approval required during the Preliminary PUD and Platting process.
5.
A
final grading plan shall be submitted for review and approved by the City
Engineer.
6.
The
Pike Lake Drive ROW shall be 40 feet wide.
7.
Sidewalks
shall be a minimum of 5 feet wide clear of signs, hydrants, etc.
8.
Sidewalks
adjacent to parking lots shall be protected from the parking lots by a
landscaped buffer with a minimum width of three feet or a landscape element such as a
fence, wall or hedge between 2’6’’ to
3’6” tall which is designed to protect
pedestrians from the intrusion of over-hanging vehicle bumpers. In areas where the sidewalk is between a
building and a parking lot the buffer area maybe paved. The design of buffers and landscape elements
shall be submitted to the City Planner for review and approval
9.
A
sidewalk shall be provided along
10. The pond in the
southeast corner of the intersection of Palmer Drive and Silver Lake Road (pond
adjacent to the Champp’s building) shall be
redesigned to ensure adequate spacing between the pond, including the pond
side-slopes and the streets, sidewalks, bus-stop and features in this area such
as signage (public and private) lighting, landscape features and street
furniture. A fence or other barrier
maybe necessary. The plans for the pond,
sidewalk and other features including fencing in this area shall be submitted
for review by staff and the Planning Commission, and approved by the City
Council.
11. Landscaping or other
features shall be provided adjacent to and/or east of the Drugstore building (
12. Mechanical equipment and
the roofs of all buildings shall be screened from view from public spaces or
otherwise located or designed to minimize visibility from rights of way and
other public spaces. Specifically the visibility of the roof and mechanical
equipment of the Drugstore building at the Southwest corner of the site, from
13. Complete landscape plans
shall be submitted for review by staff (including the City Forester and the
City Planner) and Planning Commission, and approved by the City Council.
14. The plat shall be
submitted for review by staff and the Planning Commission and approved by the
City Council. It shall provide for a 40 foot wide rights of way for
15. A vacation of
16. An interim plan for
vehicle access to and through the site between
17. Sign Plans have not been
submitted as part of this PUD approval process.
An overall sign plan shall be submitted for review by staff and planning
commission and approved by the City Council under a separate special use permit
application and approval process.
7 Ayes 0 Nays, Motion Carried.
Public Hearing:
PUD 02-002
Amendment of the General Development Plan and Amendment of a
Planned Unit Development (PUD 01-001).
Residential Component, BKV Group, Inc. for
Zoning for this is B4, downtown business. The Comprehensive Plan does call for a multi-family designation.
Design changes for large complex projects like
There are three changes:
Ron Mell of Dominium Development and Gary Vogel, architect for BKV, were present
to explain the changes and answer questions for the Commissioners.
It was moved and seconded to CLOSE THE PUBLIC HEARING.
7 Ayes, 0 Nays, Motion Carried.
Motion by Schiferl, seconded by Zisla for APPROVAL OF PUD 02-002 with the following conditions:
7 Ayes, 0 Nays, Motion Carried.
Public Hearing: SP
02-006 Special
Use Permit for a proposed garage , Robert Bultena,
Consideration of a Special Use Permit to
construct a garage larger than 400 sq. ft. on a single family lot at
The proposal is for a 44’ by 19’ detached garage (843 sq. ft).
Moved and seconded to CLOSE THE PUBLIC HEARING.
7 Ayes, 0 Nays, Motion Carried.
Motion by O’Brien, Second by Zisla to WAIVE THE READING AND ADOPT THE ATTACHED RESOLUTION recommending approval of SP 02-006, subject to the following conditions:
1. The garage is sided and roofed with same or similar materials as
the existing structure.
Public Hearing: SP
02-007 Special use Permit for a proposed detached garage,
Mark and Jeanette Allenson.
Consideration of a Special Use Permit to
construct a garage larger than 400 sq. ft. on a single family lot at
1) Aesthetics – there is a four season sun room with windows on three sides and to the north nothing would be seen but the garage and also partially to the east.
2) Potential for noise due to her mom’s bedrooms being on the north and the proximity to the drive.
3) The resale value of the property due to the two items mentioned above.
Chairman Baker explained the garage would be allowed without a special use permit, so it is simply the size that is the need for the public hearing.
Neil Gatten of 2244 Oriole Avenue spoke to the Commissioners and asked questions regarding the dimensions of the garage and driveway.
Motion by Baker, Second by O’Brien to CLOSE
THE PUBLIC HEARING.
7 Ayes, 0 Nays, Motion Carried.
Motion by Schiferl, Second by O’Keefe to WAIVE THE READING AND ADOPT THE ATTACHED RESOLUTION RECOMMENDING APPROVAL OF SP-007 subject to the following conditions:
1. The garage is sided and roofed with same or similar materials as the house.
2. The garage is moved 5’ from the south property line and 21’ from the east property line.
7 Ayes, 0 Nays, Motion Carried.
Public Hearing: SP 02-005 Special Use Permit for a new porch,
Chad and Lucinda Squires.
Consideration of
a special use permit to construct a front porch addition onto a proposed single
family home at
Mr. Boylan reviewed the plans. There was no one in the audience to speak to this.
Motion by Baker,
Second by O’Brien to CLOSE
THE PUBLIC HEARING.
7 Ayes, 0 Nays, Motion Carried.
Motion by
O’Brien, Second by Zisla to WAIVE THE
7 Ayes, 0 Nays, Motion Carried.
Public Hearing: VN02-002 – Building And
Parking Setback Variance, Martin Harstad.
Consideration of
an application for a building and parking setback variance at
Mr. Boylan explained to Commissioners the issue of the Comprehensive Plan error
which came to light during communications with Mr. Harstad regarding the variance.
The applicant had been informed that his property had a future land use designation of Low Density Residential (LDR), and that the office use would be considered nonconforming to the City of New Brighton’s Comprehensive Plan. The applicant
disagreed and asked staff to investigate. Research concluded that an error had been made when drafting the Future Land Use Map for the Comprehensive Plan. Staff has determined that the property in question should have a future designation as “Limited Business” (LB) and that the official map shall be redrawn to show this. The applicant operates an office on the site, and “office uses” are compatible with the LB future land use designation. City staff have contacted both the appraiser and the property owner and informed them of this issue. The applicant desires that this information becomes part of the official record.
Applicant was not present to discuss the variance. Mr. Boylan explained all details and answered questions for the Commissioners.
It was Moved and
Seconded to CLOSE
THE PUBLIC HEARING.
7 Ayes, 0 Nays, Motion Carried.
Motion by
O’Brien, Second by O’Keefe to RECOMMEND APPROVAL OF VN 02-002
FOR A 5 FOOT FRONT YARD BUILDING AND
PARKING SETBACK FOR 2191 SILVER
LAKE ROAD.
7 Ayes, 0 Nays, Motion Carried.
GENERAL
BUSINESS: None
ANNOUNCEMENTS AND UPDATES:
I-35W Corridor Coalition Build-Out Study Presentation will be Monday, September 9, 2002, at the New Brighton City Council Chambers at 5:30 p.m.
The 30th annual MN APA Planning Conference will be held September 11-13,
2002, at the Millennium Hotel in
ADJOURNMENT:
10:40 P.M.
____________________________________
Patrick Boylan, Intermediate City Planner