Planning
Report
Date:
Case: LP03-09 / SP03-13
Subject: Site Plan
Review for Truck Repair facility expansion
Applicant: Mr. Norm Wells on behalf of Mr.
Michael Dooley
To consider an application for site plan
review and special use permit for an expansion of the existing structure
located at
Findings
C Section 6-140 (2), (4) Specially
Permitted Uses in I-2 District
C Section 8-010 Site Plan
Review
C Section 8-130 Special
Use Permit
Site
Characteristics
1. Location:
2. Size: 3.3
acres or 146,667 sq. ft.
3. Topography: flat
4. Vegetation: Landscaping near
5. Sensitive Areas: None
Site
History
1. Past Uses:
2. Historical Significance: None
Departmental
Considerations
Community
Development
1. Comp Plan Designation: HI, Heavy Industrial
2. Zoning: I-2,
Heavy Industrial
3. Existing Land Use: Lumber Yard
4. Surrounding Land Uses:
North:
Weyerhauser,
zoned I-2, Heavy Industrial
South: Freeway
Towing, zoned I-2, Heavy Industrial
East: Interstate
Freeway I-35W
West:
5. Other Considerations: None
Proposed
Use
1. Proposed Use: The applicant wishes to expand the
existing 10,000 sq. foot building and convert it to a truck repair facility.
2. Density/FAR: Allowed: 40% for one story buildings
Proposed: 16.4%
3. Building Setbacks:
Allowed |
Proposed |
Front – 40’ |
52‘ |
Side – 15’ |
15’ (north) 21’ (south) |
Rear – 0’ |
212’ |
The proposed expansion adds
enclosed work area under existing shed roof and adds 3,920 square feet off of
the north wall of the existing building and meets setback requirements
4. Total
Drives: One
5. Drive
Size: 24
Feet Wide
6. Parking Area Surface: proposal is to pave the gravel and dirt areas for
truck parking and storage areas.
7. Landscaping/Screening:
The landscape plans are not
proposed to be altered. The existing
landscaping is used for screening purposes and as to decorate the entrance to
the site.
8. Impact on Surrounding
Land Uses: Minimal
9. Landscaping: The site has a
landscaped area near the two office buildings on
In
December 2003, the Planning Commission reviewed the concept plan and stated
that additional screening was needed for the freeway side of the site. The applicant is proposing to build up a 3’
berm with spruce trees on the top to provide additional screening to the east.
10. Other
Considerations: None
Public
Works
1. Streets:
2. Curb Cuts: One
3. Utilities: Existing
from
4. Easements: One
existing; Freeway towing and existing land owner (New Brighton Lumber) have an
agreement for an access easement along the western portion of the lot for
vehicle travel.
5. Grading/Drainage: Proposed building is to be located on
existing concrete drive area; there will be no added impervious surface to the
site. The site plan shows the east lot
line to be bermed and the removal of 5’ of existing asphalt on the north line
6. Rice
Creek Watershed District: Review by RCWD
required.
7. Environmental Concerns: None.
8. MPCA: NA
9. Other Considerations: None
Building
1. Existing Buildings: 10,000 sq.ft. (storage facility)
1,157 and
968 sq.ft. (office uses)
5,500
sq. ft. (storage)
16,657
sq. ft. total for all four buildings
Proposed addition size: 6,464
sq. ft. addition to largest building on north side;
(16,464
total sq. ft.)
2. Structure Height: 26 feet (code limit = 40 feet)
3. Exterior Treatment: Metal panels.
Proposed addition to be painted with the same materials and color scheme
as existing structure.
4. IBC Compliance: Required.
5. Parking Demand: 21 spaces
Proposed: 30
for automobiles
Tractor & truck Parking: Not specified
Ø
site
plan shows a 16,000 sq. ft. fenced, secured area for tractors and;
Ø
a
23,040 sq. ft. screened area for trailers.
6. Other
Considerations: None
Public
Safety
1. Access to Site: Adequate
2. Access to Structure: Adequate
3. Additional Hydrants: not needed
4. Y Connection Location: to be approved by Fire Marshal
5. Other Considerations: None
Staff
Comments
The City of
Section 6-140
Paragraph 2 of this section of the Zoning Code states that
truck and trailer repair are special uses.
Staff finds that the special use standards found in Section 8-130 are
met.
Paragraph 4 of this
section of the Zoning Code states that outside
storage as an accessory use are subject to compliance with the following:
A. Outside
storage areas shall be screened from adjacent residential property and public
rights-of-way by landscaping and/or an opaque fence six to eight feet tall.
B. Outside
storage shall have no adverse effect on adjacent land due to unsightliness,
noise, odor, dust, smoke, glare, air pollution, excessive or heavy vehicular
traffic, bulk chemical storage, or fire or safety hazards.
There is no adjacent residential property. The site presently has a solid 8’ fence on
the north and freeway side of the parcel.
The applicant is proposing to repair the sections of fence and construct
an earthen berm with coniferous trees to provide additional screening.
Section 8-130 Special
Use Permit
As specified in Section
8-130 of the New Brighton Zoning Ordinance, no special use shall be recommended
by the Planning Commission unless such shall find:
a. That the establishment, maintenance, or
operations of the special use will not be detrimental to or endanger the public
health, safety, morals, comfort of the general public.
b. That the special use will not be injurious
to the use and enjoyment of other property in the immediate vicinity for the
purposes already permitted, nor substantially diminish and impair property
values within the neighborhood.
c. That the establishment of the special use
will not impede the normal and orderly development and improvement of the
surrounding property for uses permitted in the district.
d. That adequate utilities, access roads,
drainage and/or necessary facilities have been or are being provided.
e. That the special use shall, in all other
respects, conform to the applicable regulations of the district in which it
located.
Staff considers the
criteria for a special use permit and regulations for screening of accessory
outdoor storage in the I-2 Zoning District to be satisfied.
The proposal complies with all I-2 standards and related requirements.
Recommendation
Motion to recommend Approval of LP03-09 and SP03-13 to the City
Council with the following conditions:
1.
Approval and compliance with any requirements from
Rice Creek Watershed District.
2.
The storage and parking areas are paved with
bituminous or concrete.
Patrick Boylan |