Planning Report
Case: PL04-01
Subject: Preliminary Plat
Applicant: Mr.
Request
To re-plat 4 parcels (1823, 1853,
1873, and Parcel “B” of
Findings
·
Section 26-33, Qualifications Governing Approval of Preliminary
Plat
Submitted
Data for Preliminary Plat
The applicant has submitted a
current Certificate of Survey showing existing conditions with all applicable
data required by the City Code including proposed name of the new subdivision,
legal description of the property, names of owner, surveyor, engineer, and
appropriate cartographic data such as a scale and north arrow.
The existing condition map
shows survey lines and indicates appropriate zoning data including building
setbacks, rights-of-way, and existing utilities.
The proposed Plat shows all
of the necessary data including a proposal to vacate excess Old Highway 8
right-of-way
Sec. 26-33. Qualifications Governing Approval of Preliminary Plat.
The Planning Commission may
return a conditional recommendation. The City Council may require revisions as it deems necessary for
the health, safety, general welfare, order and convenience of the City. The approval of a preliminary plat indicates
that the subdivider may proceed toward fulfilling the
necessary steps for approval of the final plat in accordance with the terms of
approval. No plat will be approved for a subdivision which covers an area
subject to periodic flooding or which contains extremely poor drainage
facilities and which would make adequate drainage of the streets and lots
impossible.
Staff believes that
the applicant will proceed with the necessary steps toward filing a final plat and that adequate drainage during and
post-development will be provided for the site so as to not cause flooding.
Staff
Comments
Copies of the proposed plat was
forwarded to Mn/DOT and
The approved site plan for Beisswenger’s Do It Best Hardware
Store is for a triangle shaped pond in the southern tip of the site. Conversations with
At time of writing, the City has not received any comments from Mn/DOT about the proposed plat.
Staff believes that the specific elements in the proposal are consistent with the regulations found
in Chapter 26, Subdivisions.
Recommendation
Approval
Motion to waive the
Staff
Recommendation
Staff
recommends approval of the request subject to the conditions outlined above.
|
|