My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-15-2007
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Minutes-Board Or Commission PLZ 00900
>
2007
>
05-15-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2007 2:25:20 PM
Creation date
5/24/2007 2:25:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Approved <br />PLANNING COMMISSION PROCEEDINGS <br />CITY OF NEW BRIGHTON <br /> <br />Regular Meeting – May 15, 2007 at 7:00 p.m. <br /> <br />Present: <br />Commissioners Larry Baker, Bruce Howard, Karen Mann, Jim O’Brien, and Paul Zisla. <br /> <br />Absent: <br />Tom O’Keefe, and Norm Schiferl <br /> <br />Also Present: <br />Grant Fernelius, Community Development Director and Janice Gundlach, City Planner. <br /> <br />Agenda Review: <br />Agenda approved. <br /> <br />Council Action: <br /> No Council announcements. <br /> <br /> <br />Public Hearings: <br />SP2007-004 Special Use Permit to allow construction of an equipment shelter & antennas for <br />Verizon Wireless <br /> <br />The applicant is requesting a Special Use Permit to install telecommunication equipment, including an <br />equipment shelter measuring 12’ x 20’ and additional antennas, for use by Verizon Wireless at the water tower <br />property located at 700 Silver Lake Road (also known at 675 Forest Dale Road). The need for an additional <br />equipment shelter is due to Verizon Wireless buying out an existing antenna user. In addition, Verizon <br />Wireless would install 8 new antennas (4, 8 foot in height; and 4, 4 feet in height) on the water tower. <br /> <br />In February and July of 1996 the City approved a Special Use Permit to allow telecommunications equipment <br />on the site. The February 1996 approval was for American Portable Telecom, which has subsequently been <br />bought out by T-Mobile. Antenna and an equipment shelter currently exist on this site for T-Mobile. The July <br />1996 approval was for Nextel, which also have antenna and an equipment shelter on site. However, staff was <br />not able to locate any specific Special Use Permit approvals for Qwest, which is the existing antenna user <br />Verizon is buying out. As a result, Verizon Wireless must obtain a Special Use Permit. <br /> <br /> <br /> <br /> <br />CPH. <br />Motion by ---, Second by --to <br />LOSE THE UBLIC EARING <br /> <br />MC. <br />5 ayes, 0 nays. <br />OTION ARRIED <br /> <br /> <br /> <br />Motion by O’Keefe, second by Schiferl to Approval of SP2007-004. <br /> <br />MC. <br />5 ayes, 0 nays. <br />OTION ARRIED <br /> <br /> <br /> <br /> <br />Announcements <br /> <br />I:\COMMISSIONS\PLANNING\Minutes\2007\05-15-2007.docPage 1 of 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.