My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
0732
NewBrighton
>
Council
>
Ordinance
>
Adopted
>
0700-0800
>
0732
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2006 11:59:05 AM
Creation date
9/7/2005 3:30:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ORDINANCE NO. 732 <br />STATE OF MINNESOTA <br />COUNTY OF RAMSEY <br />CITY OF NEW BRIGHTON <br /> <br />AN ORDINANCE RELATING TO STORMW ATER RUN OFF FROM <br />CONSTRUCTION SITES; AMENDING CITY CODE SECTION 7-99 AND <br />ADDING NEW SECTIONS 7-103 AND 7-104 <br /> <br />THE CITY COUNCIL OF THE CITY OF NEW BRIGHTON ORDAINS that the <br />Code of Ordinances of the City of New Brighton, Minnesota is amended as follows: <br /> <br />Section 1. <br /> <br />Section 7-99 of the City Code is amended as follows: <br /> <br />Sec. 7-99. Erosion Control. <br /> <br />The applicant for a building or other construction related pennit shall take all reasonable steps <br />to prevent or minimize damage to private or public property caused by erosion from the <br />construction site. When erosion occurs despite such efforts, the permit holder shall promptly <br />act to clean up and restore the damaged property to its original condition. (Ord. No. 561, 12- <br />8-87; Code of 1988; Code of2001) <br /> <br />Erosion control and prevention measures for construction sites shall meet standards from <br />State Agencies regulating stonnwater runoff. <br /> <br />(1) Erosion control measures shall adhere to design standards and specifications <br />established and published by the Minnesota Department of Transportation and the Minnesota <br />Pollution Control Agency. The most recent handbooks shall be used as reference for <br />diagrams, tables, and illustrations. <br /> <br />(2) The appropriate pollution control measure for each site shall be determined by the <br />City Engineer. <br /> <br />(3) For "dewatering" activities, the water pumped from site shall be treated to reduce <br />turbidity and sedimentation. <br /> <br />(4) The nearest down gradient water body or drain inlet must be identified and protected <br />prior to commencement of any site work. Drain or water body protection shall remain in <br />place until site is stabilized. Drain protection shall be established to allow emergency flow to <br />occur. The City Engineer shall determine when a site is stabilized. <br /> <br />Section 2. <br /> <br />Section 7-103 is added to the City Code as follows: <br /> <br />Section 7-103 Exceptions <br /> <br />Activities listed below shall be considered excepted by the standards in this chapter <br /> <br />1. Project approval received by either Rice Creek Watershed District, MPCA, DNR, or US <br />Army Corps of Engineers <br />2. Building permits approved prior to the adoption of this ordinance <br />3. Any emergency work to protect life, limb, or property. <br />
The URL can be used to link to this page
Your browser does not support the video tag.