My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
0311
NewBrighton
>
Council
>
Ordinance
>
Adopted
>
0300-0399
>
0311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2006 11:07:09 AM
Creation date
7/1/2005 8:10:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />..,. <br /> <br />'~..- <br />....... <br /> <br />.,..."..._...------ <br /> <br />. ;r. <br />- ::T <br /> <br />ill. <br /> <br />...-' ...~ <br />.- <br /> <br />ORDINANCE NO. <br /> <br />311 <br /> <br />; STATE OF MINNESOTA <br />COUNTY OF RAMSEY <br />VILLAGE OF NEW BRIGHTON <br /> <br />I <br />AN ORDINANCE AMENDING SECTIONS OF SECTION 265 OF THE 1966 ORDINANC <br />CODE OF THE VILLAGE OF NEW BRIGHTON ENTITLED SEWER DEPARTMENT <br />REGULATIONS <br /> <br />The New Brighton Village Council does ordain as follows: <br /> <br />SECTION 1. Section 265:22, Subd, 1(2) of the 1966 Ordinance <br />Code is hereby amended to read as follows: <br /> <br />(2) The "connection charge" is imposed with respect to and <br />for each and every "Residential Equivalent Connection" <br />represented by the connection from such lot, parcel of land, <br />building, or premises, and is a charge which~.is (unless otherwise <br />provided) calculated as follows: <br /> <br />For each "Residential Equivalent Connection": <br /> <br />(a) Made to the Village system from any premises on or <br />after January 1, 1973, a charge of.............. .$32~5j.OO <br /> <br />(b) Public Housing Units and housing units subsidized <br />under any federal program for low and moderate income <br />housing shall pay a charge equal to 75 per cent of the <br />regular charge. <br /> <br />(c) After January 1, 1973, connection charges are payable <br />at the time of building permit issuance and the <br />building inspector shall not issue a building permit <br />until such' connection charge is paid. If a building <br />permit was issued prior to January 1, 1973, but <br />connection had not been made, connection charges are <br />then payable at the time of connection. <br /> <br />(d) Upon a connection being made to the Village system from <br />any premises, a connection to any other system, public <br />or private, from said premises shall be disconnected <br />unless otherwise permitted by the Village. <br /> <br />SECTION 2. Section 265:22, Subd. 3 (1) and (2) of the 1966 <br />Ordinance Code is hereby amended to read as follows: <br /> <br />Subd. 3. The "use charge" is a charge imposed with respect <br />to and for each and every "Residential Equivalent Connection" <br />represented by the connection from such lot, parcel of land, <br />building, or premises, and is a charge imposed and collected <br />quarterly and calculated as follows: <br /> <br />11 <br />I <br />I <br />I <br />Ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.