My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-14-06 - Revised (2)
NewBrighton
>
Commissions
>
Commissions-OLD
>
EDC
>
Minutes
>
2006
>
03-14-06 - Revised (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 6:38:47 PM
Creation date
4/16/2007 4:49:32 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
having townhouses available for the Parade of Homes in February next year. The construction of <br /> the condos will start after they have fifty percent pre-sold. <br /> Property Acquisitions <br /> Black reported that staff met with Lee Larson recently regarding access to the railroad spur for <br /> environmental testing, and use of his land to access other properties for environmental cleanup. <br /> While Larson agreed to allow the City to cross his property for the demolition, he was not very <br /> favorable of the City doing environmental testing until a deal has been worked out for <br /> purchasing the land. During the meeting they also discussed the possibility of the City <br /> purchasing the east side of the spur first and then the west side at a different time. Kaufhold <br /> inquired if the meeting included the purchase of the spur on the east side of 35W. Black replied <br /> that Arden Hills would work with New Brighton on a joint application for abandonment. <br /> Fernelius replied that another company is also looking into purchasing the east side of 35W. <br /> Flahave inquired if the City's purchase agreement for the Dugan site was for the whole site. <br /> Fernelius replied that it was just for the three acres that the City needs in order to relocate the <br /> spur. He added that the City has still not heard a response back from the company regarding the <br /> offer. He stated that since the offer is just for an area which has been leased to a third party, it <br /> would not affect the use of the existing building. Fulton reported that there is a possibility of the <br /> site being used for a private, on-site water treatment facility; however this idea is very new and <br /> has not been fully discussed. <br /> Black reported that one of the owners of the post office recently passed away. Jim Casserly has <br /> been leading the negotiations with the remaining owner. Nelson inquired when the new post <br /> office could possibly be opened. Black replied that if everything goes according to plan, the <br /> retail component could open this fall. <br /> Black reported that Ferrellgas have had a few issues finding a new location. The City has hired a <br /> relocation consultant to help them find a new location; they are hoping that they can build later <br /> this year. <br /> Dump Cleanup <br /> Black reported that the PCA has told the City that our plans for dealing with the methane from <br /> the dump are not sufficient. The City had proposed adding four to six feet of clean fill with <br /> strategically placed vents and monitoring systems for all of the buildings near the dump. The <br /> PCA would like to have no residential units on any portion of the dump area or within three <br /> hundred feet. They also proposed that the City install a collection system over the dump, which <br /> would gather the methane gas and then have a flame that would burn the gas off. Black <br /> indicated that Fulton would be having a meeting with the depai liiient head of the PCA to discuss <br /> an alternative solution. <br /> Nelson inquired if the issue was because methane is toxic or if it is explosive in nature. Black <br /> replied that it is because it's potentially explosive if allowed to concentrate. Harmon inquired <br /> who helped the City come up with the original proposed plan. Black replied that Barr <br /> Engineering helped the City come up the plan when Medtronic was looking to build in that area. <br /> Nelson inquired what the cost would be to dig out the dump. Black responded that it would cost <br /> roughly $50 million dollars to remove all of the dump material. Several Commissioners inquired <br /> if the City could go back to the owner of the dump, which was privately owned, and have them <br />
The URL can be used to link to this page
Your browser does not support the video tag.