Laserfiche WebLink
Approved � <br /> Motion by Baker, Second O'Keefe by to CLOSE THE PUBLIC HEARING. <br /> 4 Ayes, 0 Nays, MOTION CARRIED. <br /> Zisla recommended the following Item to address the public art topic: The final plan will <br /> designate locations for use for a public art program and will include a public art plan and program <br /> to include design elements, recommended features, and an implementation and financing process. <br /> He stated that this was not a definite proposal, but something to work with for the City and the <br /> developers to come up with some sort of plan. Baker inquired if the Commission should add that <br /> the developer and the City will develop a public art plan for submittal with the final plan. Zisla <br /> agreed and added that it should include locations, design elements and financing plan. Harrington <br /> stated that typically the process for developing public art is usually much longer than what a <br /> development project takes. It would be appropriate to state that any land that is publicly <br /> dedicated land, public right of way, or that has public easements include the ability to place <br /> public art on them. He believes that the public art process may take a year or two before it is <br /> complete. Zisla replied that what they are proposing is very wide open and general, but they <br /> would like to see some movement on this topic. Baker stated that they will add an Item 24: The <br /> developer and the City shall have defined a process for implementation of a public art component, <br /> including generalized locations,possible design elements, and financial responsibility,which will <br /> submitted with the final PUD. <br /> Motion by O'Keefe, second by NO SECOND MOTION MADE to Move the Staff Approval <br /> with the Following Modifications: <br /> • Item 2 to include the trail bridge and trail crossing as part of the site plan, <br /> • Item number 6 to include revisions to provide easements to trails and private <br /> streets as deemed necessary by the City Engineer and Parks Department, <br /> • Item 10 approval of a list of building materials to be submitted prior to final plan <br /> approval, <br /> • Item 13A clarification of maintenance responsibilities of land dedicated as park <br /> space or trails within the preliminary plat, <br /> • Item 24 the Developer and the City will submit a plan for a public art program <br /> that will be submitted as part of the PUD <br /> And to WAIVE THE READING AND ADOPT THE RESOLUTION* RECOMMENDING <br /> APPROVAL OF PUD05-02, LP05-13, and PL05-08 subject to the following <br /> conditions: <br /> 1. Approval of a re-zoning of all areas except Outlot A identified in Site Plan Submittal <br /> (C01) as prepared by Kimley Horn and Associates, Inc. and dated December 29, 2005 <br /> from Mixed-Use(MX)to Multiple-Family Residential(R3A). <br /> 2. Approval of Site Plan Submittal(CO1) as prepared by Kimley Horn and Associates,Inc. <br /> and dated December 29, 2005 subject to a minor revision to accommodate re-alignment <br /> of the road located between Buildings #1, #46, #37 and Pond 2 and acknowledgement <br /> that the trail and bridge crossings are not the developer's responsibility. <br /> 3. Approval of Parking Plan Submittal (CO2) as prepared by Kimley Horn and Associates, <br /> C:\Documents and Settings\jgoepe\Local Settings\Temporary Internet Files\OLK28\1-31-2006 Special <br /> meeting regarding NWQ.doc <br />