Laserfiche WebLink
PLANNING REPORT <br /> DATE: May 11, 2006 <br /> CASE: SP2006-007 <br /> SUBJECT: Special Use Permit to Construct a 100' Monopole Wireless <br /> Telecommunications Tower <br /> APPLICANT: Kari Brown on Behalf of T-Mobile <br /> REQUEST&BACKGROUND <br /> The applicant has been working on behalf of T-Mobile in order to locate a site for a new wireless <br /> telecommunications tower for T-Mobile. The Zoning Ordinance provides standards under which <br /> towers can be constructed by approval of a Special Use Permit. The applicant has submitted all <br /> necessary materials to be considered for a Special Use Permit. <br /> During staff review, it was discovered that the proposed antenna did not meet the required <br /> setbacks. The applicant has corrected the construction plans in order to meet all required <br /> setbacks. However, the attached survey does not reflect the revised setback. The applicant has <br /> indicated a revised survey will be available prior to the public hearing. Staff is confident the <br /> necessary survey will be submitted and all setback requirements will be met. <br /> ATTACHMENTS <br /> A—Resolution <br /> B—Project Location Map <br /> C—Zoning Map <br /> D—Aerial Map <br /> E—Land Use Application <br /> F—Applicant Narrative <br /> G—T-Mobile Project Info. & General Notes <br /> H— Site Plan <br /> I—Enlarged Site Plan <br /> J Antenna Info. & Tower Elevation <br /> K—Power& Grounding Plan <br /> L—Certificate of Survey <br /> M—350' Neighbor Notification Map <br /> FINDINGS <br /> Section 4-600 (2). Building Permit Required <br /> Section 4-600 (4). Special Use Permit <br /> Section 6-140. Specially Permitted Uses in an I-2 District <br /> Section 8-130. Special Use Standards <br /> SITE CHARACTERISTICS <br /> 1. Location: 348/350 1st Street SW <br /> 2. Lot Size: 6.1 Acres (267,224 s.f.) <br /> 3. Topography: Generally Flat <br /> 4. Comprehensive Plan Designation: Industrial <br /> 5. Zoning: I-2, Heavy Industrial <br /> 6. Surrounding Land Uses: <br />