Laserfiche WebLink
it <br /> Site Selection Methodology <br /> Once T-Mobile Central engineers determine the general area in need of a new communication <br /> site,we begin our search for possible locations by reviewing the local zoning code requirements <br /> and searching for suitable existing structures for collocation. In this case,no existing water tower <br /> or other tall building exists near the proposed tower site that would be considered feasible as a <br /> collocation site. <br /> Attached is a completed and signed Special Use Permit application,3-full size and 3 reduced <br /> copies of T-Mobile's site plan and elevation drawings,related application documents and the <br /> appropriate application fee. The Abstractor's Certificate of property owners within 350' of <br /> subject property was sent directly to the City of New Brighton by the abstractor. <br /> It is our understandingthat this application will be reviewed at apublic hearingmeeting <br /> pp <br /> II <br /> scheduled for May 16th,2006. We will be happy to present our plans at that meeting, and answer <br /> any questions the commission or the general public may have regarding this proposed facility. <br /> Thank you for your attention to this matter. Please feel free to call me at 952-292-9337 with any <br /> questions or concerns. <br /> Respectfully submitted, <br /> AD <br /> Kar'T.Brown <br /> Sit- ' cquisition Contractor <br /> Attachments: <br /> • Exhibit A-Zoning Code findings <br /> • Exhibit B-Site Plan and Elevation Drawings <br /> • Exhibit C-copy of memorandum of lease with underlying property owner <br /> • Exhibit D-Licensed Professional Engineers Certificate <br />