Laserfiche WebLink
4.C. Wireless telecommunications towers/antenna may be constructed to a height <br /> that exceed the required setback up to 33%. As a Condition of approval,the City <br /> must be provided with a licensed professional engineer's certification that the tower <br /> is designed to collapse or to fail within a distance or zone shorter than the required <br /> setback distance as determined by the height of the structure or telecommunications <br /> tower. The required setback is specified in Section 4-600 (2) A-B. <br /> Due to the need to order the tower to be built for specifications of this fall zone and for <br /> the foundation to be designed specifically to this fall zone; my client requests that this be <br /> a condition of the S.U.P. The engineer's certificate would then be provided with the <br /> Building Permit application. <br />