Laserfiche WebLink
<br />PLANNING COMMISSION PROCEEDINGS <br />CITY OF NEW BRIGHTON <br /> <br /> <br />Regular Meeting –June 15, 2004 at 7:30 p.m. <br /> <br />Present: <br />Commissioners Larry Baker, Jim O’Brien, Norm Schiferl, Karen Mann, <br /> <br /> Bruce Howard and Paul Zisla <br /> <br /> <br /> <br />Absent: <br />Commissioners Tom O’Keefe and Karen Mann <br /> <br />Also Present: <br />Patrick Boylan, City Planner <br /> <br />? <br /> Council Action - <br /> <br />Mary Burg, City Council Member reported on some changes to two <br />polling places to allow for better accessibility. Part of the Pike Lake <br />School precinct location has been moved to St. John the Baptist <br />Church and Bel Air School precinct No. 2, has been moved to Salem <br />Covenant Church on Silver Lake Road. <br />. <br />? <br /> Approval of Minutes – <br />May 18, 2004 <br /> <br />Agenda Review <br />: No changes <br /> <br />Public Hearing: NC04-02, LP04-04 Nonconforming Use Permit & Site Plan – <br />Faulkner Construction on behalf of Doug DeFresne of Midwest Powder Coating, <br />st <br />Inc. at 720 1 St. SW. <br />Consideration of an application by Mr. James Faulkner, Architect, on behalf of <br />Assembly, Packaging & Screen Printing for a Non-confirming Use Permit and Site Plan. <br />The purpose of the request is to construct a 14,000 square foot addition onto the existing <br />st <br />building at 750 1 St. SW. The site has the following type 4 non-conformities: <br /> <br /> <br />1.The employee parking area does not have curb and gutter on the west side; and <br />encroaches into the front yard setback; <br /> <br />2.The existing structure encroaches into the rear yard setback; <br /> <br />3.The landscaping is dead or missing; and <br /> <br />4.Outdoor storage is not screened from the right-of-way. <br /> <br />Mr. Boylan reviewed the Site Plan for the Commissioners. The applicant’s site plan <br />reduces the number of non-conformities by the addition of a paved parking area with curb <br />and gutter, improving the landscaping and removing the unscreened outdoor storage. The <br />proposed site plan meets the regulations for Type 4 Non-conformities. <br /> <br />Mr. Faulkner, Architect of the project, also spoke to the Commissioners and gave them a <br />chance to ask questions. <br />1 <br />I:\COMMISSIONS\PLANNING\Minutes\2004\06_15_04.doc <br /> <br />