Laserfiche WebLink
<br /> <br />Approved <br />PLANNING COMMISSION PROCEEDINGS <br />CITY OF NEW BRIGHTON <br /> <br />Regular Meeting – August 16, 2005 at 7:30 p.m. <br /> <br />Present: <br />Commissioners Larry Baker, Bruce Howard, Tom O’Keefe, and Norm <br />Schiferl. <br /> <br /> <br /> <br />Also Present: <br />Patrick Boylan, City Planner and Kerry Thorne, City Engineer <br /> <br />? <br /> Agenda Review <br />: No changes <br /> <br />? <br />Approval of Minutes <br />: <br /> The July 19, 2005 minutes were approved with the following <br />changes: O’Brien seconded on the SP 05-13 Special Use Permit for two car sales events <br />at Main Street Village, not Schiferl; and “The conclusion was that the proposed use “food <br />shelf” and the pre-K and adult education uses are consistent with the existing uses. The <br />consensus was that the applicant shall be allowed to re-program the space within the <br />building, provided they stay within the confines of the existing parking.” <br /> <br />? <br />Council Action: <br /> <br /> Boylan reported that all items that were reviewed by the Planning <br />Commission at last month’s meeting were approved by the Council in July. <br /> <br /> <br />Public Hearing: <br />LP05-10 Amendment to an approved Site Plan Modify an Approved Special <br /> <br />Use Permit (SP05-11 & LP05-07, modifying SP04-01 & LP03-08) <br /> <br />Consideration of a proposal to amend an approved site plan and special use permit for to <br />construct a new 47,687 sq. ft. Beisswenger’s Do It Best hardware store with an outdoor garden <br />center. On May 24, 2005, the Council granted Mr. Beisswenger approval for an amended site <br />plan. The original plan was presented and approved in January of 2004. Since receiving <br />approval in May of 2005, the applicant has made two significant changes to the building design: <br />a larger building footprint, which is the result of the removal of the basement storage area, the <br />entire sales and storage facilities, will be conducted in a larger one-story building; and, a proposal <br />to expand the outdoor “garden center.” The garden center would be modified by replacing a <br />significant amount of pavement with additional green space for a demonstration and sales area. <br /> <br />All Commissioners expressed concern about the proposed changes. They felt that the green area <br />in the garden center would not remain green and would eventually be covered in rock and would <br />become unsightly. They also were also concerned that the building surpassed the allotted size for <br />the zoning area and that required parking spaces had shrunk. <br /> <br />Mr. Norm Wells, Architect, approached the commission and addressed some of their concerns. <br />He explained that the building size increase is for storage, due to cost constraints the applicant <br />had to remove the basement that was on the last two design plans. He stated that he would have <br />to look at all of the design plans to clear up the problem with the parking and there would be no <br />storage in the outdoor garden center. Mr. Wells expressed a concern regarding the delay in <br />1 <br />I:\COMMISSIONS\PLANNING\Minutes\2005\8-16-05.doc <br /> <br />