My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-17-2006
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Minutes-Board Or Commission PLZ 00900
>
2006
>
10-17-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2007 2:19:27 PM
Creation date
5/24/2007 2:19:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Approved <br />undesirable to some for redevelopment. She believes that the best use for the site is an <br />outdoor use without the construction of a building, which encourages potential <br />redevelopment. She stated that the benefits of approving this application are that the City <br />would retain an employer with the possibility of expanding employment, maximize the <br />land value of the site to increase its tax value, and it’s a desirable use that can be used in <br />New Brighton redevelopments and in the metro area. <br /> <br />The applicant used the City’s Traffic Consultant to assess the impact of traffic on the site. <br />The facility would be operating at a reduce capacity than the site to the south, which will <br />eliminate truck traffic to the south and not increase the traffic problem at Hwy 96 and Old <br />Hwy 8. The existing facility to the south is in compliance with all noise regulations and <br />the applicant expects that the new operation would continue to operate within those <br />limitations. The applicant has proposed some operational changes to reduce potential <br />noise issues. The applicant is planning on using a new technology called a hush horn to <br />eliminate the backing up noise created by heavy machinery it does not carry for as long <br />of a distance. They will pave the graveled haul road, which will allow the applicant to <br />direct traffic in a better way. The applicant is also proposing to run a crushing operation, <br />similar to what Belair is currently operating, however they will be operating an electric <br />versus a diesel version which is quieter. They will also comply with all day and night <br />time noise regulations. <br /> <br />The applicant is also requesting to run a hot mix operation for twenty-four hours a day. <br />However, they would operate in the evening hours only when a contractor calls with a <br />need for hot mix. This is a seasonal operation and would not run all year long. The <br />crushing operation would be run from 7 am and 7 pm, but crushing would not occur <br />constantly during this time period. <br /> <br />She addressed the concerns of dust and odor that were raised in the letters sent to the <br />City. Belair installed a state of the art dust control system four years ago and while it can <br />not prevent all dust from leaving the site it has improved the issue. The applicant also <br />has a water truck wet down any un-sprinkled areas and provide additional watering as <br />needed. The paving of the haul road will also help with any dust problems. To help with <br />the odor problem, the applicant is prepared to bring in new hot mix plant equipment. <br />This new equipment will have updated technology that will capture odor, dust, and <br />emissions from those operations. <br /> <br />She stated that there were some concerns regarding the screening of the operations. The <br />view of the operation is reasonably well screened from the road, and the adjacent open <br />space. There is a thousand foot clearance from the site to Rush Lake, which provides a <br />buffer to the residential area on the other side of the lake. Stock piles on site are limited <br />to forty feet and the applicant is prepared to comply with that height limit. There would <br />be one view impact for the development; occasionally the operation will emit a steam <br />plume. The new equipment brought on site will be taller than the stock piles. The <br />applicant is requesting as a variance a hot mix/asphalt plant silo operation that could be <br />as tall as seventy feet. The silos will be new, modern looking and have the ability to be <br />painted a neutral color to minimize its impact on the view. In comparison of how tall the <br />I:\COMMISSIONS\PLANNING\Minutes\2006\10-17-2006.docPage 3 of 9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.