My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ccp 07-10-2007
NewBrighton
>
Council
>
Packets
>
2007
>
ccp 07-10-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2007 2:14:33 PM
Creation date
7/6/2007 2:45:38 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> D. CONTRACT ADMINISTRATION. <br /> <br /> 1. The City will prepare and execute a construction contract with the lowest <br /> responsible bidder, hereinafter referred to as the "Contractor," in accordance with <br /> the special provisions and the latest edition of Mn/DOT's Standard Specifications <br /> for Construction and all amendments thereto. <br /> <br /> 2. The Project(s) will be constructed in accordance with plans, special provisions, <br /> and standard specifications of each Project. The standard specifications will be <br /> the latest edition of Mn/DOT Standard Specifications for Highway Construction, <br /> and all amendments thereto. The plans, special provisions, and standard <br /> specifications will be on file at the City Engineer's Office. The plans, special <br /> provisions, and specifications are incorporated into this agreement by reference <br /> as though fully set forth herein. <br /> <br /> 3. The City will furnish the personnel, services, supplies, and equipment necessary <br /> to properly supervise, inspect, and document the work for the Project(s). The <br /> services of the City to be performed hereunder may not be assigned, sublet, or <br /> transferred unless the City is notified in writing by Mn/DOT that such action is <br /> permitted under 23 CFR 1.33 and 23 CFR 635.105 and state law. This written <br /> consent will in no way relieve the City from its primary responsibility for <br /> performance of the work. <br /> <br /> 4. The City will document quantities in accordance with the guidelines set forth in <br /> the Mn/DOT Contract Administration Manual Sections 410 and 420 that were in. <br /> effect at the time the work was performed. <br /> <br /> 5. The City will test materials in accordance with the Mn/DOT Schedule of <br /> Materials Control in effect at the time each Project was let. The City will notify <br /> Mn/DOT when work is in progress on the Proi ect(s) that requires observation by <br /> the Independent Assurance Inspector as required by the Independent Assurance <br /> <br /> Schedule. <br /> <br /> 6. The City may make changes in the plans or the character of the work, as may be <br /> necessary to complete the Project(s), and may enter into supplemental <br /> agreement(s) with the Contractor. The City will not be reimbursed for any costs <br /> of any work performed under a supplemental agreement unless Mn/DOT has <br /> notified the City that the subject work is eligible for federal funds and sufficient <br /> federal funds are available. <br /> <br /> 7. The City will request approval from Mn/DOT for all costs in excess of the <br /> amount of federal funds previously approved for the Project(s) prior to incurring <br /> such costs. Failure to obtain such approval may result in such costs being <br /> disallowed for reimbursement. <br /> <br /> 8. The City will prepare reports, keep records, and perform work so as to enable <br /> Mn/DOT to collect the federal aid sought by the City. Required reports are listed <br /> <br /> (Mn/DOT Agreement No. t< .k , ) <br /> NAFedAid\Agreement\tatest samples\147-000-000 new brighton DCP Agency Agreement 06_dce 2/5/00 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.