Laserfiche WebLink
Owner: ew Brighton <br />Project: 0 d Highway 8 NW Reconstruction <br />SAP 147-020-033 <br />Partial Payment: 3 <br />Date: August 31, 2007 <br />Cade: 491-40703-6751 <br />Contractor: North Pine Aggregate, inc. <br />14551 Lake Drive <br />Forest Lake, MN 55025 <br />Phone: (651)464-6802 <br />Fax: (651)464-8456 <br />• <br />Page 1 of 5 <br />Schedule A <br />Roadway Improvements <br />No MNIDOT No. Item Description <br />1 2021.501 MOBILIZATION <br />2 2101.501 CLEARING <br />3 2101.502 CLEARING <br />4 2101.506 GRUBBING <br />5 2101.507 GRUBBING <br />6 2104.501 REMOVE CHAIN LINK FENCE <br />7 2104.501 REMOVE CONCRETE RETAINING WALL <br />8 2104.501 REMOVE CURB AND GUTTER <br />9 2104.501 REMOVE RAILROAD TRACK <br />10 2104.503 REMOVE CONCRETE WALK <br />11 2104.505 REMOVE BITUMINOUS PAVEMENT <br />12 2104.509 REMOVE SIGN <br />13 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />14 2104.523 SALVAGE EXISTING BILLBOARD <br />15 2104.523 SALVAGE SIGN <br />16 2104.601 REMOVE SIGNAL SYSTEM (RAILROAD) <br />17 2104.607 REMOVE MISCELLANEOUS DEBRIS (DEMOLITION WASTE) (LV) <br />18 2104.607 REMOVE MISCELLANEOUS DEBRIS (LANDFILL WASTE) (LV) <br />19 2105.501 COMMON EXCAVATION (ROADWAY) (P) <br />20 2105.507 SUBGRADE EXCAVATION (EV) <br />21 2105.522 SELECT GRANULAR BORROW (CV) <br />22 2211.604 6" AGGREGATE BASE PLACED, CLASS 7 (PROVIDED BY CITY) <br />23 2211.604 15" AGGREGATE BASE PLACED, CLASS 7 (P) (PROVIDED BY CITY) <br />24 2232.501 MILL BITUMINOUS SURFACE (2") <br />25 2350.501 TYPE LV 3 WEARING COURSE MIXTURE (B) <br />26 2350.502 TYPE LV 3 NON WEARING COURSE MIXTURE (B) <br />27 2360.501 TYPE SP 12.5 WEARING COURSE MIX (4,C) <br />28 2360.502 TYPE SP 12.5 NON WEARING COURSE MIX (4,C) <br />29 2521.501 4" CONCRETE WALK <br />30 2521.511 2" BITUMINOUS TRAIL <br />31 2521.616 4" CONCRETE WALK SPECIAL (URBAN TRAIL) <br />32 2531.501 CONCRETE CURB & GUTTER DESIGN B618 <br />33 2531.501 CONCRETE CURB & GUTTER DESIGN B624 <br />34 2531.501 CONCRETE CURB & GUTTER DESIGN B624 MODIFIED <br />35 2531.503 4" CONCRETE MEDIAN <br />36 2531.602 PEDESTRIAN CURB RAMP <br />37 2531.616 TRUNCATED DOMES <br />38 2545.523 2" NON-METALLIC CONDUIT (PVC) <br />39 2545.523 4" NON-METALLIC CONDUIT (PVC) <br />40 2545.523 6" NON-METALLIC CONDUIT (PVC) <br />41 2550.512 HANDHOLE TYPE-PVC LIGHT DUTY METAL COVER <br />42 2550.523 4" NON-METALLIC SIGNAL CONDUIT (PVC) <br />43 2554.505 PERMANENT BARRICADES <br />44 2563.601 TRAFFIC CONTROL <br />45 2564.531 SIGN PANELS TYPE C <br />46 2564.602 INSTALL SIGN <br />47 2564.618 CONSTRUCTION SIGNS - SPECIAL <br />48 2573.502 SILT FENCE, TYPE MACHINE SLICED <br />49 2573.550 EROSION CONTROL SUPERVISOR <br />50 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE <br />51 2575.511 MULCH MATERIAL, TYPE 1 <br />52 2575.605 SEEDING, MNDOT MIX NO. 250 <br />53 2582.501 PAVEMENT MESSAGE (LEFT ARROW) - EPOXY <br />Contract Amount Quanity <br />Est. Quan Unit Unit Price Amount to Date Amount <br />1.00 LS $ 24,000.00 $ 24,000.00 1 $ 18 000.00 <br />3.00 ACRE $ 1240.00 $ 3,720.00 3 $ 3,720.00 <br />18 TREE $ 129.00 $ 2,322.00 15 $ 1,935.00 <br />3.00 ACRE $ 1,860.00 $ 5580.00 3 $ 5,580.00 <br />18 TREE $ 51.00 $ 918.00 15 $ 765.00 <br />1,220 LF $ 2.40 $ 2928.00 735 $ 1,764.00 <br />305 LF $ 12.00 $ 3,660.00 $ <br />8320 LF $ 1.20 $ 9984.00 1,200 $ 1,440.00 <br />500 LF $ 7.00 $ 3,500.00 $ - <br />13,500 SF $ 0.45 $ 8075.00 8 844 $ 3,979.60 <br />15,000 SY $ 110 $ 18,000.00 4 558 $ 5,469,60 <br />15 EACH $ 21.00 $ 315.00 $ <br />780 LF $ 1.20 $ 936.00 946 $ 1,135.20 <br />2 EACH $ 8,000.00 $ 16.00G.00 $ - <br />5 EACH $ 22.00 $ 110.00 $ <br />1 LS $ 3.000.00 $ 3,000.00 $ <br />100 CY $ 36.00 $ 3 600.00 $ <br />100 CY $ 55.00 $ 5,500.00 $ - <br />26,745 CY $ 2.50 $ 66 862.50 6,700 $ 16,750.00 <br />2,000 CY $ 2.75 $ 5,500.00 $ - <br />2,000 CY $ 14.00 $ 28 000.00 $ <br />1,325 SY $ 5.50 $ 7,287.50 $ - <br />22,440 SY $ 3.70 $ 83,028.00 5,610 $ 20 757.00 <br />5,300 SY $ 2.00 $ 10,600.00 $ <br />120 TON $ 56.35 $ 61762.00 $ <br />120 TON $ 56.35 $ 6,762.00 $ - <br />6,215 TON $ 52.75 $ 327 841.25 10 $ 527.50 <br />3,330 TON $ 52.50 $ 174.825-00 10 $ 525.00 <br />960 SF $ 2.85 $ 2,736.00 $ - <br />4,68 0 SF $ 0.93 $ 4 352.40 $ <br />14,565 SF $ 2.85 $ 41510.25 $ - <br />900 LF $ 10.55 $ 9,495.00 70 $ 738.50 <br />4 280 LF $ 11.80 $ 50 504.00 1,656 $ 19 540.60 <br />5140 LF $ 13.00 $ 75 920.00 455 $ 5,915.00 <br /> SY $ 22.85 S 14 281.25 <br /> EACH $ 228.85 $ 2,722.20 <br />% SF $ 36 80 $ <br /> LF $ 5.70 $ 3 420.00 $ <br /> LF $ 6.55 $ 6,550.00 200 $ 1,310.00 <br />340 LF $ 9.00 $ 3,060.00 60 $ 540.00 <br />24 EACH $ 835.00 $ 20 040.00 6 $ 6,680.00 <br />1,250 LF $ 9.95 $ 12,437.50 375 $ 3,73115 <br />100 LF $ 26.90 $ 2.690.00 $ <br />1.00 LS $ 10,345.00 $ 10 345.00 0.4 $ 4,138.00 <br />190 SF $ 28.45 $ 5,405.50 $ - <br />5 EACH $ 108.00 $ 540.00 $ - <br />150 SF $ 5.15 $ 772.50 $ <br />4,500 LF $ 1.70 $ 7,650.00 600 $ 1,020.00 <br />1.00 LS $ 4,210.00 $ 4,210.00 0.4 $ 1,684.00 <br />2 EACH $ 1,008.50 $ 2017.00 $ - <br />13 TON $ 165.00 $ 2,145.00 $ <br />5.00 ACRE $ 181.50 $ 9D7.50 $ <br />12 EACH $ 123.00 $ 11476.00 $