Laserfiche WebLink
• <br />CJ <br />The wall would be replaced with a decorative modular block wall more commonly used today in <br />today's landscaping. The new wall will be designed by an engineer certified in retaining wall <br />design to ensure structural stability and integrity. <br />Twenty-ninth Avenue NW is a M.S.A. street which may allow the City to use M.S.A. funding <br />for the cost of replacement. If M.S.A. denies funding the replacement of this wall, the City <br />would not replace the wall as part of this project. <br />PUBLIC SAFETY IMPOUND LOT PAVING - The Public Safety impound lot is <br />located in the northwest corner of the City's maintenance facility at 700 5th Street NW. The lot <br />is used to store vehicles seized or forfeited as a result of police action. Please see the Public <br />Safety Lmpound Lot Paving map on Page 14. <br />The maintenance facility parking lot is paved with the exception of the area used to park the <br />impounded vehicles. These vehicles are parked on a gravel surface which is not consistent with <br />the New Brighton Zoning Code, Section 11-20 (1) Surfacing. All off-street driving, loading, and <br />parking areas shall have a bituminous or concrete surface. Off-street parking and drive areas for single <br />and two family residences may be constructed of brick or decorative block. <br />This impound lot is an attractive nuisance. Vehicles get damaged due to break-ins; windows get broken <br />and the glass is scattered throughout the gravel lot. Without a hard paved surface, this lot is nearly <br />impossible to clean. <br />We recommend the area be prepared and graded by City maintenance crews and paved by the <br />project Contractor thus saving money. <br />ESTIMATED PROJECT COSTS <br />The total estimated project cost for Project 08-1 is as follows: <br />4 <br />ESTIMATED COST <br />Construction Costs <br />$796,550 <br />In -House Engineering and Administration <br />$158,200 <br />Professional Services <br />$11,300 <br />Capitalized Interest <br />$38,550 <br />Contingencies (10%) <br />$78,700 <br />TOTAL ESTIMATED PROJECT COST <br />$1,083,300 <br />4 <br />