WATER SYSTEM IMPROVEMENTS - Staff recommends replacing the existing <br />watermain on 14th Street NW from a point approximately 225 feet west of 29th Avenue NW to <br />Silver Lake Road as part of this project. Please see the Watermain Replacement map on Page <br />10. This section of watermain is an 8 inch cast iron pipe (C.I.P.) which was constructed in 1960 <br />and has experienced several breaks over the years. It is proposed the new watermain be 8 -inch <br />polyvinylchloride (P.V.C.). The existing watermain is located north of the north curb line in the <br />boulevard area. The new watermain will be installed in the roadway area which is more desirable <br />in making it more accessible for maintenance and repairs. Along with the new watermain, new <br />water services will be installed between the main and property line, and additional valves and <br />new hydrants will be added to improve fire protection. <br />All other watermains in the project area are the newer ductile iron pipe (D.I.P.) of which no <br />watermain breaks have occurred to date. <br />SANITARY SEWER IMPROVEMNTS - The sanitary sewer mains in the proposed <br />reconstruction area have been inspected by televising. In reviewing the inspection reports, three <br />problems were identified as needing repair. <br />The sanitary sewer line on 14th Street NW at Silver Lake Road has a broken service wye that <br />needs to be excavated and repaired. Also two sags were detected in sewer lines, one on 13th <br />Terrace NW east of 27th Avenue NW and one in the easement south of 13th Terrace NW in the <br />extension of 27th Avenue NW. These sags have the potential of causing sewer backup and are <br />recommended to be excavated and repaired as part of this reconstruction project. Please see the <br />Sanitary Sewer Repairs map on Page 11 showing the location of these problem areas. <br />STORM SEWER IMPROVEMENTS - The City's Surface Water Management Plan <br />shows no major improvements needed to the storm sewer system in the proposed reconstruction <br />areas. <br />At the informational meeting, a concern with street flooding at the intersection of 13th Terrace <br />NW and 27th Avenue NW was brought to staff's attention. The addition of additional catch <br />basins at this intersection will be investigated. Please see the Storm Sewer Improvement map on <br />Page 12 showing the location of these problem areas. <br />An inspection of the storm sewer system has found no major problems in the project area. <br />However, if during construction a structure is found to need repair, it will be repaired before the <br />final street work is done. <br />29TH AVENUE NW RETAINING WALL REPLACEMENT - The existing <br />retaining wall in the west boulevard of 29th Avenue NW was constructed in 1986 of recycled <br />concrete curb sections. The resident at 2908 Brookshire Lane has expressed safety concerns and <br />displeasure with the appearance of the existing retaining wall and has requested the wall be <br />replaced. Please see the 29th Avenue NW Retaining Wall Replacement Map on Page 13. <br />3 <br />