Laserfiche WebLink
1. Environmental Health Survey Report, Pre -Demolition Hazardous Materials Survey, Former <br />Ferrellgas Site, 1430 Old Highway 8, New Brighton, Minnesota. Applied Environmental <br />Sciences, Inc. April 28, 2008. <br />2. Pre -Demolition Asbestos/Lead Paint/Hazardous Material Abatement, City of New Brighton, <br />Former Ferrellgas Site, New Brighton, Minnesota. Applied Environmental Sciences, Inc. <br />May 5, 2008. <br />3. Demolition Specification No. 02220. <br />Additionally, the following documents relating to the property are available for review by <br />appointment at New Brighton City Hall: <br />1. Storm Water Pollution Prevention Plan, Northwest Quadrant Redevelopment Project, New <br />Brighton, Minnesota. Barr Engineering Co. May 2006. <br />2. Phase I Environmental Site Assessment, 1430 Old Highway 8 and Nearby Railroad Property. <br />Barr Engineering Co. March 2007. <br />3. Phase H Investigation Work Plan, Propane and Railroad Parcels, Northwest Quadrant <br />Redevelopment Area, New Brighton, Minnesota. Barr Engineering Co. April 2008. <br />It is the Contractor's responsibility to visit the site and become familiar with local conditions that <br />may affect cost, progress, performance of the work; consider federal, state and local Laws and <br />Regulations; and review all documents provided before submitting a bid. <br />Page 2 of 3 <br />