Laserfiche WebLink
<br /> t .# ~ <br /> Ii ... ..... <br /> . . <br />.. <br />i ... <br /> NOW THEREFORE BE IT RESOLVED by the City Council of the <br /> city of New Brighton: <br /> 1. That the Director of Public Works of the city of New <br /> Brighton is hereby ordered to prepare a feas ibility <br /> study on the proposed improvement of 10th Street N.W. <br /> between I 694 and I 35W by widening, the construction <br /> of curbing, surfacing and drainage facilities and <br /> landscaping. <br /> 2. That the Director of Public Works should seek the <br /> cooperation and assistance of the Ramsey County <br /> Engineer in developing a plan for lOth Street N.W. <br /> which is mutually beneficial to the City and the Cour,ty. <br /> 3. That the City Manager of the City of New Brighton is <br /> hereby authorized to obtain any property appraisals, <br /> soil borings, and street lighting design assisstance <br /> necessary to prepare a complete feasibility study. <br /> 4. That 10th Street N.W. be improved along it's present <br /> alignment to the extent possib1~ with right-of-way <br /> J acquisition where additional width for proper design <br /> ! is necessary. <br /> 5. That an intersect iOl configurat ion at the I 694 <br /> interchange be pursued which would provide access to <br /> the Po1ynes ian vi llage Apartments from 10th Street <br /> N.W. via llth Avenue N.W. and a new road connection <br /> over the low undeveloped land to the East and South. <br /> Adipted this 13th day of June, 1978 <br /> ATTEST: <br /> .~ @ ()j),~ Gary <br /> Vernon C. Pederson, Clerk <br /> ( SEA L ) <br />