Laserfiche WebLink
P1 . o <br />NEW <br />)BRIGHTON <br />the city that works for you <br />July, 2008 <br />Dear New Brighton Resident <br />The streets in your neighborhood are scheduled to be seal coated in August. <br />Please see the map on the back of this sheet for the location of streets being <br />seal coated. <br />Streets are seal coated 5 years and again at 13 years after their construction or <br />reconstruction. Seal coating is considered routine maintenance and there is no <br />direct charge or assessments to the property owners for this work. <br />Seal coating is a process of distributing bituminous oil, or liquid asphalt, on the <br />street surface and then covering it with small rock chips. The rock is allowed to <br />work into the oil for approximately 10 to 14 days and then the excess rock is <br />swept up. The new seal coat provides the street a new waterproof surface and <br />uniform look. Prior to seal coating, the City cleans and fills pot holes and cracks, <br />and thoroughly sweeps the streets. <br />When the "NO PARKING' signs are put up, please do not park on the streets <br />being seal coated until the work has been completed. You may drive on the <br />streets immediately after the seal coat is applied but we ask that you drive <br />slowly to minimize dust and scuffing of the new surface. <br />City of New Brighton <br />Engineering Department <br />(651)638-2050 <br />