CITY OF NEW BRIGHTON <br />ENGINEERING DEPARTMENT <br />JULY 17. 2008 <br />CONTRACTOR: <br />CHANGE ORDER 3 <br />BELAIR EXCAVATING <br />2200 OLD HIGHWAY 8 NW <br />NEW BRIGHTON, MN 55112 <br />651-786-1300 <br />FAX 651-766-0769 <br />PROJECT 07-12, NWQ PHASE II ENVIRONMENTAL CLEANUP <br />PURPOS E/DESC RIPTION: <br />1.) Muck was found at elevations lower than represented in the soil borings making it more difficult to excavate than anticipated. <br />The City and Contractor have negotiated a price to excavate the deep muck that is equal to one and half times the contract bid <br />price. Original Muck Excavation of $1.50 per cubic yard times 1.5 equal $2.25 per cubic yard. The location of this work is from <br />Grid Lines F though L; Station 3+00 to 4+00. <br />2. & 3.) Lead contaminated soil was encountered where old battery casings had been buried. The MPCA requires the contaminated soil be <br />stockpiled, chemically stabilized, tested, and disposed of off site. This operation was not included in the original contract. <br />4.) Fill material is being imported and deposited on site by a third party. It is agreed that Belair Excavating will place material as fill <br />and will be paid at the unit price for subgrade excavation. <br />5.) During the course of the project, materials such as rubble, lead soils, and concrete and bituminous were uncovered, removed, <br />and paid for as specific Change Order items. The volume of these items were originally included in the subgrade excavation and <br />are to be deducted from the quantity of total subgrade excavation measured to date. <br />ACTION: THIS CHANGE ORDER AND THE FOLLOWING ITEMS ARE HEREBY ADDED TO AND ARE PART OF THE CONTRACT <br />TOTAL OF ADDED ITEMS <br />DEDUCT <br />5 DEDUCT SUBGRADE EXCAVATION <br />TOTAL OF CHANGE ORDER 3 <br />APPROVED BY: <br />GRANT WYFFELS, PE <br />DIRECTOR OF PUBLIC WORKS <br />CITY OF NEW BRIGHTON <br />APPROVED BY: <br />BELAIR EXCAVATING <br />APPROVED BY COUNCIL ACTION: <br />$112,832.15 <br />-20,000 CY $1.27 -$25,400.00 <br />$87,432.15 <br />ORIGINAL CONTRACT AMOUNT $1,723,309.10 <br />PREVIOUS CHANGE ORDERS <br />DOCUMENTS. <br />CONTRACT PRICE PRIOR TO CHANGE ORDER <br />$1,863,095.10 <br />NET INCREASE OF CHANGE ORDER <br />$87,432.15 <br />NEW CONTRACT PRICE WITH CHANGE ORDERS <br />ESTIMATED <br />UNIT <br />ADD <br />QUANTITY <br />PRICE <br />TOTAL <br />1 <br />ADDITIONAL DEEP MUCK EXCAVATION <br />10,000 CY <br />$2.25 <br />$22,500.00 <br />2 <br />STABILIZE AND DISPOSE OF LEAD CONTAMINATED <br />SOIL <br />1,560 TN <br />$53.71 <br />$83,787.60 <br />3 <br />STOCKPILE LEAD IMPACTED SOIL <br />1 LS <br />$6,544.55 <br />$6,544.55 <br />4 <br />MOVING IMPORTED FILL MATERIAL TO BE PAID AS <br />SUBGRADE EXCAVATION ($1.27/C.Y.) <br />NO CHANGE <br />TOTAL OF ADDED ITEMS <br />DEDUCT <br />5 DEDUCT SUBGRADE EXCAVATION <br />TOTAL OF CHANGE ORDER 3 <br />APPROVED BY: <br />GRANT WYFFELS, PE <br />DIRECTOR OF PUBLIC WORKS <br />CITY OF NEW BRIGHTON <br />APPROVED BY: <br />BELAIR EXCAVATING <br />APPROVED BY COUNCIL ACTION: <br />$112,832.15 <br />-20,000 CY $1.27 -$25,400.00 <br />$87,432.15 <br />ORIGINAL CONTRACT AMOUNT $1,723,309.10 <br />PREVIOUS CHANGE ORDERS <br />$139,786.00 <br />CONTRACT PRICE PRIOR TO CHANGE ORDER <br />$1,863,095.10 <br />NET INCREASE OF CHANGE ORDER <br />$87,432.15 <br />NEW CONTRACT PRICE WITH CHANGE ORDERS <br />$1,950,527.25 <br />CHANGE IN CONTRACT TIME <br />DATE <br />DATE <br />Add 10 working days: <br />New completion date <br />is August 29, 2008 <br />