My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-22-2008
NewBrighton
>
Council
>
Packets
>
2008
>
CCP 07-22-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 11:30:33 PM
Creation date
7/18/2008 3:41:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E X G A V A T I N G <br />NW Quadrant <br />Soil Stabilization Procedure <br />Belair Excavating proposes to handle the lead impacted soil with debris by excavating <br />with a track excavator, placing in an off-road truck and carting to stockpile area. <br />At the stockpile area, the impacted soil will be placed on poly. The impacted soil will <br />then be introduced with a Free Flow 100 treatment reagent for RCRA metals at a rate of <br />2-3% and mixed with a track excavator. Samples should then be taken by Ban <br />Engineering and TCLP testing for RCRA metals should be initiated. Passing analytical <br />data should be provided to Belair Excavating for use in gaining landfill acceptance to <br />dispose of treated lead impacted soils. <br />Once Belair has obtained acceptance by the landfill, treated lead impacted soil will be <br />loaded into trucks manifested for disposal at the landfill. All material will quantified by <br />scale tonnage of landfill manifests. <br />E FL -i-) F -D W ?2H S(P Ton 5 — A2i-71 <br />2200 Old Highway 8 NW, New Brighton, MN 55112 <br />Phone:65I.M6.1300 Fax: 651.786.0769 <br />belairexeavating.corn <br />Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.